<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>Gordon Energy Solutions - All Updates</title>
    <link>http://prism.gordonenergysolutions.com</link>
    <description>All Updates</description>
    <item>
      <title>Ichthys Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2722</link>
      <description>The FID was announced on 1/13/2012.  As a result, project maturity has been upgraded from FEED to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 13 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Svalin Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5265</link>
      <description>The field has been added following a contract award.  Economic evaluations are subject to change as further detail becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 06 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Repsol SandRidge Mississippian JV Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5270</link>
      <description>Following the JV alliance between Repsol and SandRidge this project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 06 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bøyla Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5269</link>
      <description>Following award of subsea contracts the field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 05 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mackay Oil Sands JV Phase 1 Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5145</link>
      <description>Following exercize of Athabasca's option, its 40% interest in the project was sold to PetroChina</description>
      <category>Prism Update</category>
      <pubDate>Wed, 04 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Total Chesapeake EnerVest Utica JV Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5263</link>
      <description>Following JV alliance between Chesapeake, EnerVest and Total this field has been added.  Results are subject to revision as further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 03 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chesapeake Utica Shale DP Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5232</link>
      <description>Chesapeake transferred 542,000 acres to a JV with Total.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 03 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Oyo Operator Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3329</link>
      <description>ENI sold its 40% interest in the field.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 02 Jan 2012 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Guara Phase 1 Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4591</link>
      <description>Petrobras announced estimated recoverable reserves of 2.1 billion boe</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mackay Oil Sands JV Phase 1 Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5145</link>
      <description>Following POD approval the project status has been upgraded from concept to construction.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alliance-Repsol Volga-Urals JV Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5262</link>
      <description>Field was added following Repsol acquisition of 49% interest</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Karan Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4393</link>
      <description>Capital cost estimates have been increased to US$8 billion.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 27 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>NW Java PSC Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3005</link>
      <description>CNOOC sold its interest to EMP International</description>
      <category>Prism Update</category>
      <pubDate>Fri, 23 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Donggi-Senoro LNG Gas Supply Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4839</link>
      <description>Mitsubishi will sell 9.8% interest to Korea Gas.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 22 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Luva Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4945</link>
      <description>Based on information provided by Statoil capital cost has been revised upward from prior GES estimates to US$6 billion</description>
      <category>Prism Update</category>
      <pubDate>Wed, 21 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kearl Phase II Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2856</link>
      <description>Based on an Imperial PR 12/21/2011 output has been downgraded to 110 Mb/d</description>
      <category>Prism Update</category>
      <pubDate>Wed, 21 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kearl Phase II Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2856</link>
      <description>Based on an Imperial PR 12/21/2011 our earlier GES estimate of capital cost has been increased to Imperial's estimate of $8,608</description>
      <category>Prism Update</category>
      <pubDate>Wed, 21 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Who Dat Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5242</link>
      <description>LLOG started production on 12/9/2011</description>
      <category>Prism Update</category>
      <pubDate>Wed, 21 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gazelle Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5260</link>
      <description>Following plan approval the field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 16 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Termokarstovoye Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4797</link>
      <description>Following FID decision the project status has been upgraded from FEED to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 16 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Termokarstovoye Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4797</link>
      <description>Based on announcement at FID peak daily output has been increased from 50 to 65 Mboe/d</description>
      <category>Prism Update</category>
      <pubDate>Fri, 16 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Skarv/Idun Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3431</link>
      <description>Due to weather related delays startup is delayed until second quarter 2012.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Karachaganak 1 &amp; 2 Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3031</link>
      <description>Kazmunaigaz acquires 10% interest in the field.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 14 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Karachaganak Phase 3 Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3032</link>
      <description>Kazmunaigaz acquires 10% working interest in the field.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 14 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubarao Azul (Waimea) Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5111</link>
      <description>Startup has been delayed slightly to January 2012</description>
      <category>Prism Update</category>
      <pubDate>Wed, 14 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Draupne Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5259</link>
      <description>Field added after LOA signed for jackup drilling rig to be used in the development.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn Mining Phase I (North Mine) Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2844</link>
      <description>Costs have been increased from prior estimate which was based on a range.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chim Sao Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4767</link>
      <description>Estimated field cost has been increased relative to previous GES estimate following a report from Santos.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 06 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Reindeer Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4401</link>
      <description>Following startup, project status has been upgraded to producing from construction.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 06 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Visund North Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5255</link>
      <description>Added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 05 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Utica Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5256</link>
      <description>The field has been added as part of Prism development.  Model premises are very tentative and subject to change.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 05 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alma and Galia Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5257</link>
      <description>Field was added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 05 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>PNG Gas Project Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3481</link>
      <description>Santos has been advised by Exxon Mobil, operator of the PNG LNG project, that due to the stronger Australian dollar the estimated capital cost of the project has increased by US$0.7 billion to US$15.7 billion. Santos? 13.5% share of the increased capital cost is approximately US$100 million.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 01 Dec 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Evans Shoal Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4859</link>
      <description>ENI acquired Santos' share in the project</description>
      <category>Prism Update</category>
      <pubDate>Tue, 29 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Evans Shoal Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4859</link>
      <description>ENI acquired Santos' share in the project</description>
      <category>Prism Update</category>
      <pubDate>Tue, 29 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Logbaba Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5118</link>
      <description>Condensate reserves have been upgraded slightly from prior GES estimates.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 29 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Logbaba Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5118</link>
      <description>Condensate output has been upgraded slightly from prior GES estiamtes.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 29 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Deepwater Mozambique Gas Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5051</link>
      <description>Anadarko Petroleum Corp. has upgraded its recoverable gas reserves offshore Mozambique on the basis of results from the Barquentine-3 appraisal well.&#xD;
&#xD;
The company says it now estimates recoverable resources of 15-30 tcf of natural gas with 30-50 tcf of gas in place. Previous estimates put the reserves at closer to 10 tcf.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 29 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>F-O (Project Ikhwezi) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5252</link>
      <description>Project added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vilje South Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5253</link>
      <description>The field has been added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Lagia Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5254</link>
      <description>The field has been added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kerendan Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5225</link>
      <description>Salamander increased its share to 80% by acquiring an 11% interest held by PT ElnusaPatra Ritel</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Masila Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4496</link>
      <description>Following expiration of its PSC, Nexen and Oxy shares in the field have been reduced to zero.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Heimdal Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3402</link>
      <description>Centrica acquired a 10% working interest from Statoil.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kvitebjørn Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3407</link>
      <description>Centrica acquired a 19% working interest from Statoil</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Valemon Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3459</link>
      <description>Centrica acquired a 13% working interest from Statoil</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SKIRNE Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3433</link>
      <description>Centrica acquired Statoil's 10% working interest.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vale Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3458</link>
      <description>Centrica acquired Statoil's 28.853% working interest</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Brynhild (Nemo) Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4821</link>
      <description>Noreco sold its 20% interest to Lundin.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 18 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Aseng (Benita) Start Year Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4587</link>
      <description>Production started in mid November 2011 approximately 7 months ahead of schedule.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Horizontal Niobrara and Codell DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5248</link>
      <description>Based on Anadarko's announcement concerning the potential of its horizontal Niobrara program this project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Brynhild (Nemo) Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4821</link>
      <description>Following approval of the plan of development and award of subsea contract the project status was upgraded from Concept to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 11 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>V. Filanovsky Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3556</link>
      <description>Planned startup has been delayed by one year from prior estimates.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 10 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>YPF Loma La Lata Norte Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5246</link>
      <description>The field has been provisionally added based on data supplied by YPF.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 08 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP Pan American Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4445</link>
      <description>The deal to sell BP's interest to CNOOC and Bridas was terminated.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 07 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Martin Linge (Hild) Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4484</link>
      <description>Statoil exchanged a 2% interest Hild to Total for a 2.5% additional interest in Valemon</description>
      <category>Prism Update</category>
      <pubDate>Fri, 04 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Valemon Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3459</link>
      <description>Statoil exchanged a 2% interest Hild to Total for a 2.5% additional interest in Valemon</description>
      <category>Prism Update</category>
      <pubDate>Fri, 04 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Snøhvit Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3437</link>
      <description>Statoil has agreed to buy Hess' 3.26% interest in the field.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 04 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sacha Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5245</link>
      <description>The field has been added following announced development plan by PetroEcuador and PdVSA</description>
      <category>Prism Update</category>
      <pubDate>Tue, 01 Nov 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SuTu Den (Black Lion) Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4259</link>
      <description>ConocoPhillips sold its interest to PetroVietnam.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SuTu Den NE Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4260</link>
      <description>ConocoPhillips sold its interest to PetroVietnam</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SuTu Nau Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4261</link>
      <description>ConocoPhillips sold its interest to PetroVietnam.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SuTu Trang Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4262</link>
      <description>ConocoPhillips sold its interest to PetroVietnam.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SuTu Vang Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4263</link>
      <description>ConocoPhillips sold its interest to PetroVietnam.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Rang Dong (Block 15-2) Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4753</link>
      <description>ConocoPhillips sold its interest to PetroVietnam.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Prirazlomnoye Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3528</link>
      <description>The drilling platform arrived on site with drilling to commence before year-end 2011</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Who Dat Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5242</link>
      <description>The field was added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Condor Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5243</link>
      <description>The field was added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Goose Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5244</link>
      <description>The field was added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Guendalina Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5090</link>
      <description>The field was upgraded from construction to producing.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mandy Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5182</link>
      <description>Startup has been delayed until 1st quarter 2012</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mandy Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5182</link>
      <description>Based on an estimated range of 10 to 30 mmboe reserves reported by LLOG, prior reserve estimates have been increased.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubular Bells Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4226</link>
      <description>The prior GES estimate has been revised upward following the Hess announcement of FID.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 25 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubular Bells Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4226</link>
      <description>BP assigned its interest to the other partners.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 25 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubular Bells Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4226</link>
      <description>BP assigned its interest to the other partners.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 25 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubular Bells Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4226</link>
      <description>Previous estimate based on Chevron information have been revised down following Hess announcement of FID.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 25 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Platong Gas II Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3591</link>
      <description>Following start of production, project maturity has been upgraded to producing.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gajah Baru Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4532</link>
      <description>Following production start, project maturity has been upgraded to producing</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Devenick Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4920</link>
      <description>Based on BP announcement capital cost has been increased from prior GES estimates.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Devenick Reserves</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4920</link>
      <description>BP estimates of reserves have been added following announcment of FID.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Causeway General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5089</link>
      <description>Technip contract to supply EPIC for pipelines and umbilicals added.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kitan Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4347</link>
      <description>Following announced startup project status was upgraded from construction to producing.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 21 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chesapeake Anadarko DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5235</link>
      <description>Field added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 18 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Range SW Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5236</link>
      <description>Field added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 18 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Wingate Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5233</link>
      <description>Added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 17 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Statoil Brigham Bakken DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5234</link>
      <description>Field added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 17 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chesapeake Utica Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5232</link>
      <description>Field added as part of Prism  development.  Model premises are subject to change as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 17 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sinopec Daylight Legacy Assets Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5241</link>
      <description>Following agreement for Sinopec to acquire Daylight, the legacy assets of Daylight have been added.</description>
      <category>Prism Update</category>
      <pubDate>Sun, 09 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Edvard Grieg (Luno) Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4822</link>
      <description>Startup delayed to late 2015 following Lundin announcement.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 07 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Huntington Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4404</link>
      <description>Based on Premier announcement startup delayed to 3rd quarter 2012</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chim Sao Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4767</link>
      <description>Based on Premier announcement, startup on 10/7/2011</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chim Sao Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4767</link>
      <description>Field added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Devon Lloydminster DP Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4732</link>
      <description>Reported wells in 2010 and 2011 increased over prior estimates.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gail-Carrizo Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5226</link>
      <description>Following GAIL farm in the field has been added</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>TNK-BP Ukraine Shale Gas DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5227</link>
      <description>The project has been added on a tentative basis.  The project model is provisional and subject to significant revisions.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Catcher Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5228</link>
      <description>The field was added as part of Prism development.  Model pending further information.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Syd Arne Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2949</link>
      <description>DONG exercised its pre-emptive right on the Hess deal.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 04 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Syd Arne Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2949</link>
      <description>Danoil exercised pre-emptive rights on the Hess deal.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 04 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cygnus Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4528</link>
      <description>Following FEED contract award to AMEC, project status has been upgraded from concept to feed.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 03 Oct 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SGL Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5224</link>
      <description>Field added as Prism development program.  Model pending.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kerendan Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5225</link>
      <description>Field added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Duart Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3753</link>
      <description>Nexen sold its 50% interest to Bridge</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Balnaves Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5184</link>
      <description>Based on Apache FID announcement reserves have been increased.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Balnaves Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5184</link>
      <description>Based on Apache FID announcement reserves have been increased.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Johan Sverdrup (Avaldsnes-Aldous Major South) Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5187</link>
      <description>Based on announcements from Lundin and Statoil reserves have been increased substantially.  Model results have not yet been revised pending further confirmation.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Nare-Teca Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5221</link>
      <description>Added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chichimene Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5222</link>
      <description>Field added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Elgin Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3763</link>
      <description>ENI acquired GDF's working interest</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Franklin Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3786</link>
      <description>Eni acquired GDF WI</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Wheatstone-Iago Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2755</link>
      <description>Following FID, the project has been moved to construction status.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 26 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Julimar-Brunello Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4554</link>
      <description>Following FID the project has been upgraded to construction status</description>
      <category>Prism Update</category>
      <pubDate>Mon, 26 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>NWS Oil Redevelopment Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4413</link>
      <description>Woodside announced production on Okha FPSO began 9/24/2011 with first shipment planned Nov 2011</description>
      <category>Prism Update</category>
      <pubDate>Mon, 26 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Fossekall-Dompap (Skuld) Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5064</link>
      <description>Following STO submission of PDO, prior capital cost estimate has been increased.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 26 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bir Seba Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5220</link>
      <description>Added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Fri, 23 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kolvinskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5217</link>
      <description>The field has been added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Thu, 22 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jette Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5218</link>
      <description>Added as part of Prism development.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 22 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yaalen Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5219</link>
      <description>Added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Thu, 22 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Clipper South Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4812</link>
      <description>Based on RWE DEA announcement we have increased the estimated cost from our prior estimate</description>
      <category>Prism Update</category>
      <pubDate>Thu, 22 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Liwan Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4506</link>
      <description>Cost has been increased by US$1.5 billion per recent Husky announcement.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 20 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Liwan Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4506</link>
      <description>Per a recent Husky announcement planned plateau output has been downgraded from 1 bcf/d to 500 mmcf/d</description>
      <category>Prism Update</category>
      <pubDate>Tue, 20 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sea Lion Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5216</link>
      <description>The field has been added after Rockhopper announced it was moving to FEED</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hess Marquette Utica DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5214</link>
      <description>The field was added following Hess acquisition of interest</description>
      <category>Prism Update</category>
      <pubDate>Thu, 08 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hess Consol Utica DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5213</link>
      <description>Following the Hess farm in to Consol Utica Shale acreage the project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Sep 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pazflor Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2678</link>
      <description>Status changed to producing with announced start of output.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 26 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pazflor Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2678</link>
      <description>2P reserve estimate upgraded somewhat to 590 mmbbls</description>
      <category>Prism Update</category>
      <pubDate>Fri, 26 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Serrette Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4360</link>
      <description>Project moved to production status on 8/26/2011</description>
      <category>Prism Update</category>
      <pubDate>Fri, 26 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Noble Consol Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5210</link>
      <description>Added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Thu, 18 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>West Wick Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5209</link>
      <description>Added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Wed, 17 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Occidental Wolfberry DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5200</link>
      <description>The field was added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Occidental Piceance DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5201</link>
      <description>The field was added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Talisman Wild River DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5202</link>
      <description>The field was added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Grosbeak Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5203</link>
      <description>Field added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shaw Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5204</link>
      <description>Added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cayley Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5206</link>
      <description>Added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cheviot Hub Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5207</link>
      <description>Added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Clipper Redevelopment Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4083</link>
      <description>Field added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Banyu Urip Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2990</link>
      <description>XOM has reported that recoverable reserves have been upgraded to 450 mmbbls</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Syd Arne Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2949</link>
      <description>Noreco sold its working interest to Hess</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Flyndre-Cawdor Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4825</link>
      <description>Following release of the project EIS in June 2011 it has been added to the database.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Marihøne Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5188</link>
      <description>The project has been added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sarawak Gas Phase 3 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5191</link>
      <description>The project was added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sarawak Gas Phase 4 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5192</link>
      <description>Field added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Block H Rotan FLNG Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5194</link>
      <description>The field has been added to the database.  Model results will be deferred until further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Noble Wattenberg Niobrara DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5196</link>
      <description>The field added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Western Desert DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5185</link>
      <description>This project has been added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jackdaw Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5186</link>
      <description>The project has been added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Johan Sverdrup (Avaldsnes-Aldous Major South) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5187</link>
      <description>The two discoveries have been added as a joint project</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Balnaves Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5184</link>
      <description>The field has been added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Coniston-Novara Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4727</link>
      <description>Startup has been delayed one year to 2013</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Coniston-Novara Reserves Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4727</link>
      <description>Reserves have been downgraded to reflect Apache estimates on 5/17/2011</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Coniston-Novara Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4727</link>
      <description>Peak output has been increased to reflect Apache estimates 5/17/2011</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Coniston-Novara Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4727</link>
      <description>Prior GES capital cost estimates have been revised upward based on Apache estimates 5/17/2011</description>
      <category>Prism Update</category>
      <pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Australia Pacific T2 Supply Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4601</link>
      <description>ConocoPhillips and Origin sold a combined 15% interest to Sinopec</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Australia Pacific T1 Supply Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4600</link>
      <description>ConocoPhillips and Origin sold a combined 15% interest to Sinopec</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bushwood Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5183</link>
      <description>The field added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Eunice Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5168</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Deadwood Wolfcamp Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5169</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP and Mariner Spraberry Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5170</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Empire Yeso Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5171</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Empire Abo Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5172</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Granite Wash Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5173</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Hogshooter Wash Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5174</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Central Horizontal Oil Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5175</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Bivins Ranch Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5176</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Bluesky Tight Gas Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5177</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Ojay Tight Gas Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5178</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Montney Shale Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5179</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache GoM Shelf Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5180</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Wide Berth Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5181</link>
      <description>The field has been added as part of the Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mandy Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5182</link>
      <description>The field has been added as part of the Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Tue, 09 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tweneboa-Enyenra Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5166</link>
      <description>The field has been added as part of the Prism development program.  Results are subject to change due to the current status as appraisal.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 08 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Permian C and North Platform Horizontals Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5167</link>
      <description>This drilling program has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Mon, 08 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Suzun-Tagul Yamal Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5162</link>
      <description>The project has been added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Fri, 05 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Central Uvat - Tyamkinskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5163</link>
      <description>The project has been added as part of Prism development</description>
      <category>Prism Update</category>
      <pubDate>Fri, 05 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>East Urengoyskoye-Novo Urengoyskoye Rospan Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5164</link>
      <description>The project has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Fri, 05 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Firebag Phase 4 Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4759</link>
      <description>Suncor announced a new startup in first quarter 2013 compared to prior estimates of fourth quarter 2012</description>
      <category>Prism Update</category>
      <pubDate>Fri, 05 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Xikomba General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2693</link>
      <description>The field will be shut down</description>
      <category>Prism Update</category>
      <pubDate>Fri, 05 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tsentralno-Astrakhanskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4764</link>
      <description>The field has been added as part of the ongoing Prism development program.  Due to the early stage of the project model results are subject to revision.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 04 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Lukoil Horizontal DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5157</link>
      <description>This project has been added as part of the Prism development program.  Results are only for drilling through 2012.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 04 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yurubcheno-Tokhomskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5158</link>
      <description>The project has been added as part of Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Thu, 04 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kharasaveyskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5159</link>
      <description>Added field as part of ongoing Prism development</description>
      <category>Prism Update</category>
      <pubDate>Thu, 04 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pyakyakhinskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5152</link>
      <description>The field has been added as part of the ongoing Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Wed, 03 Aug 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Australia Pacific T2 Supply Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4601</link>
      <description>Project status has been upgraded from appraisal to construction following FID</description>
      <category>Prism Update</category>
      <pubDate>Fri, 29 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Australia Pacific T1 Supply Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4600</link>
      <description>Project status has been upgraded from appraisal to construction following FID</description>
      <category>Prism Update</category>
      <pubDate>Fri, 29 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Karan Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4393</link>
      <description>The field has been upgraded from construction to producing.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Njord Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3414</link>
      <description>GDF Suez acquired ExxonMobil's 20% working interest</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Njord Gas Export Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3415</link>
      <description>GDF Suez acquired ExxonMobil's 20% working interest</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Njord NW Flank Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3416</link>
      <description>GDF Suez acquired ExxonMobil's 20% working interest</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Manora Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5151</link>
      <description>Added as part of ongoing Prism development program</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Manora Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5151</link>
      <description>Added as part of ongoing Prism development</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Margarita-Huacaya Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5148</link>
      <description>The project was added as part of the ongoing Prism development program.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Buckskin Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5149</link>
      <description>The field has been added as part of the ongoing Prism development program.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kinteroni Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5147</link>
      <description>This field has been added as part of the ongoing Prism development program.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jinzhou 25-1 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5141</link>
      <description>The field has been added as part of the ongoing development of Prism.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jinxian 1-1 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5142</link>
      <description>The field has been added as part of the ongoing development of Prism.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Luda (LD) 32-2 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5143</link>
      <description>The field has been added as part of the ongoing Prism development program.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Dover Oil Sands Project Phase 1 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5144</link>
      <description>The field has been added as part of the ongoing Prism development program.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mackay Oil Sands JV Phase 1 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5145</link>
      <description>This field was added as part of the continuing Prism development program.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Carabobo 1 Norte and Carabobo 1 Centro Blocks Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4241</link>
      <description>Based on a Repsol presentation we have delayed startup to 2014.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>North Reggane Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4654</link>
      <description>The startup of this field has been delayed two years to 2014.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Perla Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4993</link>
      <description>Based on a Repsol presentation the start year has been delayed by one year.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Abadi (Masela Block) Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4373</link>
      <description>Shell has acquired a 30% working interest in the project from Inpex.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Abadi (Masela Block) Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4373</link>
      <description>Shell has acquired a 30% working interest in the project from Inpex.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tui Area Reserves Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3121</link>
      <description>Initial recoverable 2P reserves estimates have been downgraded based on the operator's report.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Berry North Midway-Sunset Diatomite Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5139</link>
      <description>Following regulatory approval the project has been added.  Cash flow model development is pending.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kinosis SAGD Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5140</link>
      <description>The field has been added as part of the ongoing development of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Middle Ground Shoal Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4162</link>
      <description>Chevron sold its interest to Hilcorp.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Granite Point Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4123</link>
      <description>Chevron sold its interest to Hilcorp.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Trading Bay Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4444</link>
      <description>Chevron sold its interest to Hilcorp.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Long Lake SAGD P1 Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4344</link>
      <description>CNOOC has agreed to acquire Opti.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 20 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kitimat LNG Gas Supply Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4774</link>
      <description>Apache stated that first LNG is expected by end of 2015 representing a delay from a prior estimate of startup in 2014.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 19 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Logbaba Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5118</link>
      <description>Victoria Oil &amp; Gas increased its working interest to 95% following RSM Production Corporation's forfeiture for failure to meet a cash call.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 19 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Endeavour SM Energy Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5138</link>
      <description>The project has been added as part of the ongoing development of Prism.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 18 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Lucius Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4908</link>
      <description>Lucius and Hadrian discoveries have been unitized.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 18 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Lucius Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4908</link>
      <description>The unitized Lucius/Hadrian projects have been upgraded from appraisal to concept.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 18 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petrohawk Haynesville Shale DP Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4971</link>
      <description>BHP Billiton agreed to acquire Petrohawk on 7/15/2011.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 15 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petrohawk Haynesville Shale DP Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4971</link>
      <description>BHP Billiton agreed to acquire Petrohawk on 7/15/2011.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 15 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petrohawk Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5136</link>
      <description>The field has been added as part of the ongoing Prism development program.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 15 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tawke Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5135</link>
      <description>This field has been added as part of the ongoing Prism development project.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 13 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Schiehallion Redevelopment Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5061</link>
      <description>BP published the estimated cost of the project.  We have revised our models to reflect the higher cost.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 13 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mariner Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4515</link>
      <description>Following award of a topsides FEED contract to Aker the project status has been upgraded from Concept to FEED</description>
      <category>Prism Update</category>
      <pubDate>Tue, 12 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>XOM Phillips Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5134</link>
      <description>Following the announced acquisition of Phillips Resources by ExxonMobil we have added this field.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Atla Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5133</link>
      <description>The field was added following submission of PDO.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Appaloosa Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4346</link>
      <description>Following start of production on 6/21/2011 the field's maturity has been upgraded from construction to producing.  It was originally expected that the field would enter production in mid-2010 but startup was delayed by the 6 month freeze imposed by the government after the Macondo well disaster.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tempa Rossa Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3025</link>
      <description>Total increased its working interest in the field by acquiring ExxonMobil's share.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 05 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tempa Rossa Reserves Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3025</link>
      <description>As announced by Total, startup has been delayed from 2013 to 2015  with FID planned in late 2011.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 05 Jul 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kearl Phase I Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2855</link>
      <description>Capital cost estimate by Imperial of C$10.9 billion</description>
      <category>Prism Update</category>
      <pubDate>Thu, 30 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>al-Ahdab Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4390</link>
      <description>Project maturity has been upgraded from construction to producing.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 30 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hibernia Southern Extension Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4495</link>
      <description>The project maturity has been upgraded to producing.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 30 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SM Non-Operated Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5127</link>
      <description>A drilling program model has been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 30 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kirinskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5123</link>
      <description>The field has been added to the database.  Model development is preliminary and subject to change as further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 23 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Knarr (Jordbaer) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5126</link>
      <description>The field POD was submitted in early 2011.  As a result we have added this project to the database.  Model results are subject to change as additional info becomes available (especially information on FPSO lease day rate)</description>
      <category>Prism Update</category>
      <pubDate>Thu, 23 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Guendalina General Information Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5090</link>
      <description>Gas pricing has been modified to incorporate the terms of a gas sales agreement announced by Mediterranean on 6/22/2011</description>
      <category>Prism Update</category>
      <pubDate>Wed, 22 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petrochina Encana Cutbank DP Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5044</link>
      <description>Due to the announced cancellation of the JV deal between PetroChina and EnCana, PetroChina has been removed as a working interest partner in the project.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ruby Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4987</link>
      <description>Following FID, the project status has been changed to construction from concept.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ruby Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4987</link>
      <description>Based on information released at the time of FID we have revised our prior estimate upward.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Khazzan and Makarem Tight Gas Project Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3473</link>
      <description>Based on BP announcements commercial production has been delayed to 2016.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake Regional Phase 2B Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4899</link>
      <description>Project startup has been moved from 2011 to 2013.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 20 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Golden Eagle Development Area Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5034</link>
      <description>The project has been moved from FEED to construction based on Maersk announcing FID.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 20 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pluto LNG Train 1 Gas Supply Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2741</link>
      <description>Startup has been delayed to March 2012 due to slower than expected progress on the commissioning of the onshore gas plant, seven weeks of direct weather delays and an allowance for an increased contingency.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pluto LNG Train 1 Gas Supply Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2741</link>
      <description>A$900 million increase in total project cost to A$14.9 billion.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Umiat Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5120</link>
      <description>Following the acquisition of an interest in the field by Linc Energy we have added it to the database.  Project model pending.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 16 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shouyang Block CBM Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4931</link>
      <description>Based on information provided by Far East Energy we have completed the cash flow model for this project and added it to the database.  Results are subject to change based on actual drilling rates.  Results could also change if the company switches to a horizontal drilling program.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 15 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Licence 61 Lineynoye Arbuzovskoye and Kondrashevskoye Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5119</link>
      <description>The field has been tentatively added.  A cash flow model is pending.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 13 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Logbaba Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5118</link>
      <description>This field has been added as part of the ongoing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 13 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Qusahwira-Jasyura Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5116</link>
      <description>This field has been added as part of the ongoing expansion of Prism.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 09 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cheleken Contract Area (Lam and Zhdanov) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5117</link>
      <description>This field has been added as part of the continuing program to expand Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 09 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Satah Al-Razboot (SARB) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5115</link>
      <description>The field has been added as part of the ongoing program of increasing Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hadrian North Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5078</link>
      <description>Based on results of a recent well in the unit ExxonMobil released an estimate of reserves.  Based on this data we have added a cash flow model for the Hadrian unit including Hadrian North, South and the most recent discovery.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cardamom Deep Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5016</link>
      <description>Following FID, Shell has indicated peak output will be 50 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Umm Lulu Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4915</link>
      <description>The field has been added as part of the ongoing program of expanding Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Latif Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4371</link>
      <description>Based on announced results from Latif North well we have added this field.  Results are subject to change as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubarao Azul (Waimea) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5111</link>
      <description>The field has been added following release of OGX's planned development.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 07 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubarão Martelo (Waikiki) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5112</link>
      <description>Following OGX's announcement of a development plan this field has been added</description>
      <category>Prism Update</category>
      <pubDate>Tue, 07 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Parnaíba Basin Project 1 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5113</link>
      <description>Following release of the OGX development plan this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 07 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake H Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5114</link>
      <description>Based on Cenovus announcement, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 07 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ain Tsila Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5110</link>
      <description>This field has been added as part of the continuing Prism development program.  Results are subject to revision as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 06 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Deniz Phase 2 Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4361</link>
      <description>Revised cost estimate ranges from $20 to $22 billion; up from prior range of $16 to $20 billion estimated in 2009.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 06 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Deniz Phase 2 Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4361</link>
      <description>Prior GES estimate of 2015 startup has been revised to 2017.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 06 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Deniz Phase 2 Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4361</link>
      <description>Following comments attributed to BP VP of Azerbaijan we have upgraded the project from appraisal to concept.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 06 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petronas-Progress Montney DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5107</link>
      <description>Following the Petronas acquisition of a 50% interest in these assets the field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 03 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Halyard Start Year Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4726</link>
      <description>Apache reported that gas production began from the Halyard-1 discovery well.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 02 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Amistad Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4686</link>
      <description>Noble sold all of its assets to the Ecuadorean government.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 01 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Marathon-Hilcorp Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5106</link>
      <description>Following a US$3.5 billion acquisition, this project has been added to Prism.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 01 Jun 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Noa Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5105</link>
      <description>Based on information suggesting that the partners may move forward with this marginal field, we have added it to Prism.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 31 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Songo Songo Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5104</link>
      <description>As part of the continuing Prism development program this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 27 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Akkas Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5030</link>
      <description>Korea Gas has assumed KazMunaiGas' working interest that it previously relinquished.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 26 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jubilee Phase 2 Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4552</link>
      <description>Tullow will acquire E.O. Group's share in this project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 26 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jubilee Phase 1 Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4365</link>
      <description>Tullow will acquire E.O. Group's interest in this asset.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 26 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Elly-Luke Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5103</link>
      <description>Based on information provided in an offer to farm out a partial interest this field has been added.  Model development is pending further information.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 25 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Liwan Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4506</link>
      <description>Following announced contract awards project maturity has been upgraded from FEED to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 20 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>California-Fazenda Sao Jose Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5101</link>
      <description>Following declaration of commerciality these fields which are to be jointly developed  have been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 19 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hai Thach-Moc Tinh Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5102</link>
      <description>Following a contract award to GE this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 19 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Blane Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4474</link>
      <description>ENI sold its 18% WI in the field to Faroe Petroleum.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 17 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Blane Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4474</link>
      <description>ENI sold its 18% WI in the field to Faroe Petroleum.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 17 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Akkas Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5030</link>
      <description>KazMunaiGas has withdrawn from the project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 12 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gygrid Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4845</link>
      <description>Based on information from the POD, startup has been delayed from late 2012 to first quarter 2013.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 12 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alder Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3632</link>
      <description>Status has been upgraded from Concept to FEED.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 12 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Greater Angostura Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3613</link>
      <description>Gas production from the field (previously re-injected) began.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 11 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Greater Gorgon LNG Gas Supply General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2718</link>
      <description>added JX Nippon gas sales agreement.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 10 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Crawford Redevelopment Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4813</link>
      <description>Enquest will acquire an additional 32% WI in the field from Fairfield.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 10 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Crawford Redevelopment Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4813</link>
      <description>Enquest will acquire an additional 32% WI in the field from Fairfield.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 10 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Katla (Stjerne) Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4843</link>
      <description>Startup has been delayed to first quarter 2013 from late 2012.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 02 May 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Boscan Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4240</link>
      <description>2010 production has been updated for actual.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 29 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hamaca Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4247</link>
      <description>2010 production has been updated to actual.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vietnam Gas Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4264</link>
      <description>CVX announced that the FID is not expected until 4th quarter 2011.  As a result we have delayed production start by one year to 2013.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>LL-652 Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4250</link>
      <description>2010 production has been updated for actual.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chad Cameroon Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2884</link>
      <description>2010 production has been updated for actual.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Karachaganak 1 &amp; 2 Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3031</link>
      <description>2010 production has been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tengiz SGI III Expansion Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3041</link>
      <description>The project start year has been moved back to 2015 based on Chevron's announcement that FEED will begin in second half 2012 with an FID possible in 2012.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yadana Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3092</link>
      <description>2010 production updated.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Agbami Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3138</link>
      <description>2010 production has been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Agbami Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3138</link>
      <description>Based on CVX 2010 Supplement we have increased liquids reserves to 1 billion barrels.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Nemba ESR (Enhanced Secondary Recovery) Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4838</link>
      <description>Chevron announced in its 2010 Supplement that the total cost is estimated at $1 billion.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Greater Vanza-Longui Area Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4473</link>
      <description>The field has been added.  Because the potential project is still in a pre-FEED stage, model estimates are subject to revision as further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petronius Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4183</link>
      <description>Production for 2010 has been updated.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tahiti Phase 1 Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4214</link>
      <description>Historical production for 2010 has been added.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mad Dog Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4149</link>
      <description>Production has been updated for 2010.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CVX Elk Hills Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4094</link>
      <description>Output in 2010 has been updated.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CVX Kern River Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4096</link>
      <description>The production data for 2010 has been updated.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Blind Faith Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4053</link>
      <description>Production has been updated for 2010.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Golden Eagle Development Area Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5034</link>
      <description>Nexen reported an estimated US$3.3 billion cost of developing the project.  As a result the previous estimate of capital cost has been increased.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Golden Eagle Development Area Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5034</link>
      <description>Prior GES estimates of unitized interests have been revised resulting in a lower working interest for Nexen and increased interest for the other partners.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 27 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Carrizo Niobrara DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5096</link>
      <description>The drilling program has been tentatively added.  Results are subject to change as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Itochu MDU Niobrara DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5095</link>
      <description>The project has been added based on information provided by MDU resources.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Juliet General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4980</link>
      <description>A cash flow model has been generated based on estimated data.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 18 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CVX Piceance Project Maturity Progression Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4099</link>
      <description>Chevron announced in its 2010 Supplement plans to complete and bring online another 89 wells by 2013.  This is a reduction from prior GES estimates of the drilling program.</description>
      <category>Prism Update</category>
      <pubDate>Sun, 17 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Genesis Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4119</link>
      <description>Production in 2010 has been updated.</description>
      <category>Prism Update</category>
      <pubDate>Sun, 17 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Blackbird Ownership Change Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5013</link>
      <description>After KNOC opted to exit the development, Nexen and Atlantic Petroleum increased their shares on a pro rata basis.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 15 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Marubeni Marathon Niobrara DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5088</link>
      <description>This drilling program has been added following the acquisition by Marubeni of a 30% interest in Marathon's 180,000 net acres.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 15 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Causeway Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5089</link>
      <description>Following announcement of preliminary agreement to export Causeway output through the Cormorant North platform, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 15 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Terang/Sirasun/Batur Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4869</link>
      <description>The project has been upgraded from Concept to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 14 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sawan Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5085</link>
      <description>The field has been added as part of the continuing program to expand Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 13 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vigdis Nordøst Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4844</link>
      <description>Following submission of the PDO, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 12 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Central Area Field Complex (CAFC) Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4348</link>
      <description>Start of gas production has been moved up one year to 2011 as reported in ENI's 2010 20f.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 12 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Egina Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3199</link>
      <description>Project startup has be revised from late 2014 to 2015.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ofon Oil II Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3296</link>
      <description>Total indicated in its 2010 Results presentation that startup has been revised from 2012 to 2014.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ofon Oil II Reserves Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3296</link>
      <description>Total indicated in its 2010 Results presentation that estimated reserves are 250 mmboe, down from 350 mmboe estimated published in 2007.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Block 17 - CLOV Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2632</link>
      <description>Based on data provided by Total reserves have been increased to 500 mmbbls</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>OML 58 Upgrade Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4482</link>
      <description>Based on estimates from Total peak output has been upgraded to 70 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sulige Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4512</link>
      <description>Startup has been delayed to 2013 compared to original estimates of 2011.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ikike (OML 99) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5081</link>
      <description>The field has been added based on information provided by Total.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Moho North Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5082</link>
      <description>The field has been added based on data provided in Total's 2010 Results Presentation.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vega Pleyade Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5083</link>
      <description>Based on data provided by Total the field has been added.  Model estimates are subject to revision as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Julia Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5079</link>
      <description>ExxonMobil reported expected production from this field.  As a result the field has been added to the database.  Development of a cash flow model will be deferred until further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Damar Gas Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5077</link>
      <description>Data on the project was reported by ExxonMobil in its 2010 Fact Book.  The cash flow model results are subject to change as further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hadrian North Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5078</link>
      <description>ExxonMobil reported expected production rates from this project in its 2010 Fact Book.  The field has been added but a cash flow model will be deferred until further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hibernia Southern Extension Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4495</link>
      <description>ExxonMobil published revised peak output estimates resulting in an upgrade from 40 to 50 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hibernia Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2839</link>
      <description>Production for 2010 has been updated using government data.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Terra Nova Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2880</link>
      <description>2010 output has been updated to actual as reported by CNLOPB.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>White Rose Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4356</link>
      <description>2010 output updated for actual as reported by CNLOPB.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>North Amethyst Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4357</link>
      <description>Output for 2010 has been updated to actual based on CNLOPB data.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hebron Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4355</link>
      <description>Peak output as projected by ExxonMobil has been increased from 115 Mboe/d to 130 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 08 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kearl Phase II Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2856</link>
      <description>Based on information provided by ExxonMobil in its 2010 Fact Book peak output has been upgraded from an initial estimate of 100 Mb/d to 170 Mb/d.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 07 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kearl Phase I Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2855</link>
      <description>Based on ExxonMobil's 2010 Fact Book, Phase 1 peak output has been increased again from 140 to 170 Mb/d.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 07 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Telok Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5074</link>
      <description>Based on information provided by ExxonMobil the field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 07 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Block 31 Southeast Hub Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5075</link>
      <description>This field has been added based on ExxonMobil and BP information.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 07 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Block 32 Kaombo Hub 2 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5076</link>
      <description>The field has been added based on data provided by Total and ExxonMobil.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 07 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kizomba Satellites Phase 2 Kakocha and Bavuca Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5070</link>
      <description>Based on information provided by BP this project has been added.  The project is modeled after the Mavacola-Clochas pattern but assumptions are subject to revision as further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Na Kika Phase 3 Kepler and Ariel Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5071</link>
      <description>The project was added based on information provided by BP.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mad Dog Phase 2 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5072</link>
      <description>Based on information provided by BP in its Investor Presentation 2/1/2011 we have added this field which involves development of areas proved up by recent appraisal wells.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Juniper Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5073</link>
      <description>Based on information provided by BP in its Investor Presentation 2/1/2011 we have added this field.  At this time progression of the project is at an early stage.  As a result, a cash flow model will not be prepared until further information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chirag Oil Project Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4362</link>
      <description>Based on information provided by BP, peak output has been downgraded from prior estimates of 185 Mboe/d to 140 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Russkoye Yamal Heavy Oil Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4368</link>
      <description>Based on information in the TNK-BP and BP 2011 Investor Presentations we have added this project.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kinnoull Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4943</link>
      <description>Based on information reported by BP peak output has been upgraded from 40 Mboe/d to 50 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 06 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Nemba ESR (Enhanced Secondary Recovery) Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4838</link>
      <description>Chevron moved the expected start of production from 2010 to 2011.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 01 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jasmine Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3851</link>
      <description>Based on data provided by ConocoPhillips peak daily boe output has been upgraded from 85 to 100 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 01 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Platong Gas II Start Year Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3591</link>
      <description>Chevron has revised its expected startup from 2012 to 2011.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 01 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Onshore Gas Management Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5066</link>
      <description>Based on information from Chevron's Investor Presentation 3/14/2011 this project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 01 Apr 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ConocoPhillips Bakken DP Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4967</link>
      <description>Based on ConocoPhillips' Investor Presentation 3/23/2011 we have increased planned drilling in 2011.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 31 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ConocoPhillips Eagle Ford Shale DP Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4961</link>
      <description>Based on the Investor Presentation on 3/23/2011 we have increased planned wells in 2011.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 31 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Huntington Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4404</link>
      <description>Following contracts awarded to Subsea 7 project status has been upgraded from Concept to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 31 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake E Start Year Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4874</link>
      <description>Based on information provided by ConocoPhillips in its Investor Presentation 3/23/2011 we have moved startup forward from 2015 to 2014.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 31 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Upper Zakum 750 Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4946</link>
      <description>Project status has been updated from Concept to FEED following award of a contract to Technip.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 29 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gamma Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4345</link>
      <description>Reserves estimates have been upgrade to include 5 mmboe of condensate.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 29 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cascade-Chinook Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4081</link>
      <description>Startup has been delayed to mid-2011.  The project received approval of its Deepwater Operating Plan (DWOP) 3/17/2011</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Solan Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4954</link>
      <description>Premier acquired a 60% working interest in the project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Solan General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4954</link>
      <description>Startup year has been set to 2013 and capital costs estimated based on announcements from Premier.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pearl GTL Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3491</link>
      <description>Project status has been updated from construction to production as a result of first gas flow to the plant.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Thoresby Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5063</link>
      <description>Based on information released by the operator as part of an offer to farm out part of its interest, this project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Fossekall-Dompap (Skuld) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5064</link>
      <description>These combined fields have been added following award of a contract to Aker for control umbilicals.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>KNOC Anadarko Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5062</link>
      <description>Following the announced JV between Anadarko and KNOC, part of the acreage previously associated with Anadarko's Eagle Ford position has been reallocated to this new project consisting of KNOC and Anadarko.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 22 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Eagle Ford DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5040</link>
      <description>Following the announced JV between Anadarko and KNOC, the acreage associated with this drilling program has been adjusted downward and reallocated to a new project consisting of KNOC and Anadarko.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 22 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Changbei Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2889</link>
      <description>Based on reported Shell production, the peak production rate for this project has been increased by 16%.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Groningen General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3094</link>
      <description>Output from 2010 through 2015 has been updated to be consistent with annual allowable production rates per the Netherlands' authorities.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yamal LNG Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4916</link>
      <description>Upgraded from Concept to FEED based on contract award to CB&amp;I.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Qarn Alam EOR Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4417</link>
      <description>Shell revised startup to 2010-2011.  PDO in its annual media briefing indicated that first steam stages are not expected until October 2011.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cardamom Deep Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5016</link>
      <description>Based on Shell's Investor Presentation 3/15/2011 we have increased expected peak output.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kashagan Phase 1 Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3034</link>
      <description>Based on estimates provided by Shell in its Investor Presentation 3/15/2011 we have downgraded peak output estimates for Phase 1 and for Phase 2.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kashagan Phase 2 Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3035</link>
      <description>Based on estimates provided by Shell in its Investor Presentation 3/15/2011 we have downgraded peak output estimates for Phase 1 and for Phase 2.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bonga North/Northwest Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3174</link>
      <description>Shell announced startup of Bonga Northwest in 2014+ with Bonga North still at pre FID stage in its Investor Presentation (3/15/2011).</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Harweel EOR Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3472</link>
      <description>The projected startup of this project has been revised in Shell's Investor Presentation (3/15/2011) to the 2012-2013 period.  PDO, in its annual media briefing held in late February 2011 confirmed that there has been a delay in commissioning of the project from its prior schedule of mid-2010.  Startup now not expected until second quarter of 2011 according to the PDO briefing.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP Wamsutter EOR Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4067</link>
      <description>The drilling program assumptions for this project were revised down for 2009 and 2010 based on BP reported results which showed output falling short of previously announced expectations.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tahiti Phase 1 Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4214</link>
      <description>Total capital cost has been increased from US$2.7 billion for phase 1 to US$5 billion to incorporate additional US$2.3 billion for waterflooding.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Amal Steam Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5056</link>
      <description>Based on data from Shell's Investor Presentation (3/15/2011) this field was added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Appomattox Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5057</link>
      <description>Although it is still in the Concept phase, we have added this field based on data in Shell's Investor Presentation 3/15/2011.  The estimates used to generate the model are subject to change as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Linnorm Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5058</link>
      <description>The field was added in response to Shell's indications that it will enter FEED in 2011 and possibly continuing into 2012.  Model parameters, especially capital cost and startup year may be subject to significant revision.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pearls - Khazar Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5059</link>
      <description>Based on information in Shell's Investor Presentation 3/15/2011 we have added this field and ranked its project status at Concept.  A model is not yet available due to insufficient information.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Erha North Phase 3 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5060</link>
      <description>Shell reported in its Investor Presentation 3/15/2011 that this new phase was under study.  We have added the project.  Results are subject to revision as more information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Schiehallion Redevelopment Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5061</link>
      <description>This field redevelopment has been added based on information provided by Shell in its Investor Presentation 3/15/2011.  Preparation of a model is deferred pending further information.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Parque das Conchas (BC-10) Phase 2 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5055</link>
      <description>This second phase has been added based on data provided in Shell's Investor Presentation on 3/15/2011.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petroleum Development Oman Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3475</link>
      <description>Based on data reported by Shell in its 2010 20F, 2010 output has been updated and the decline rate has been re-estimated.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Xijiang 15/11 Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2914</link>
      <description>The PSC for the Xijiang fields expired in 2010.  As a result, working interests have reverted to CNOOC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Xijiang 15/22 Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2915</link>
      <description>The PSC for the Xijiang fields expired in 2010.  As a result, working interests have reverted to CNOOC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Corrib Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3023</link>
      <description>In its 2010 20F Shell announced that the project will not come online before 2013.  A previous presentation indicated startup in 2012/2013.  We have revised startup from end of year 2012 to mid-year 2013.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Schoonebeek Redevelopment Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4415</link>
      <description>After first oil in early 2011 project status has been upgraded from construction to producing.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Xijiang 24-3 Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4707</link>
      <description>The PSC for the Xijiang fields expired in 2010.  As a result, working interests have reverted to CNOOC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Xijiang 30-2 Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4708</link>
      <description>The PSC for the Xijiang fields expired in 2010.  As a result, working interests have reverted to CNOOC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Xijiang 24-1 Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4709</link>
      <description>The PSC for the Xijiang fields expired in 2010.  As a result, working interests have reverted to CNOOC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Asab Redevelopment (SAS) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4557</link>
      <description>Based on information from Shell's Investor Presentation the project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bonga SW/Aparo Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3175</link>
      <description>Our original estimate of peak production has been increased to 200 Mboe/d based on Shell's Investor Presentation 3/15/2011</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CVX/Atlas Marcellus DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4997</link>
      <description>Chevron announced plans to drill 70 Marcellus wells in 2011 with expected output for the year of 115 mmcf/d.  This is consistent with our drilling program model assumptions.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 14 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP Arkoma Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4057</link>
      <description>Production data has been updated following BP's 20F for 2010.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 11 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP Arkoma Decline Rates Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4057</link>
      <description>Based on recent release of production data we have reestimated the decline rate.  As a result the decline rate has been increased in absolute terms.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 11 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP Jonah Historical Production</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4059</link>
      <description>Production as reported by BP in its 2010 20F has been used to update information on this asset.  Decline rates have not been adjusted since the results may reflect shut in volumes due to low gas prices.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 11 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bangka Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5054</link>
      <description>Following Chevron's announcement that the project had entered FEED, we have added the project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 10 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sasol Talisman Cypress A Montney DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5053</link>
      <description>Following a JV alliance agreement bringing Sasol into Talisman's Cypress A Montney Shale acreage we have added this field.  At present there are no firm plans with respect to the start of drilling and, therefore, a cash flow model for the project has not yet been prepared.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 08 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Talisman Sasol Farrell Creek Montney DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5015</link>
      <description>This drilling program model was added following the Sasol/Talisman JV deal.  The previous model for Talisman's Montney Shale DP has been removed from the system.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 08 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Clipper South Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4812</link>
      <description>Project status has been updated from Concept to Construction following approval of the plan of development</description>
      <category>Prism Update</category>
      <pubDate>Mon, 07 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Powder River CBM DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4610</link>
      <description>The drilling program assumptions have been revised to limit the program to the company's planned five year effort.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 07 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apache Argentina Legacy General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4691</link>
      <description>Based on data reported in Apache's 2010 10K we have re-estimated the operating cost relationship and updated the projections accordingly.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 07 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kitimat LNG Gas Supply Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4774</link>
      <description>Following award of a FEED contract to KBR for the LNG facilities this project has been upgraded from concept to FEED.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 04 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Murphy Eagle Ford Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4569</link>
      <description>This drilling program has been added.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 03 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Murphy Tupper West DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5052</link>
      <description>Based on information provided in a February 2011 presentation we have added this drilling project in the Montney shale play.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 03 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Eagle Ford DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5040</link>
      <description>2010 wells completed have been updated to 71 based on information reported in Anadarko's 2010 10K.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 02 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Bone Spring DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5050</link>
      <description>Based on preliminary results of the Anadarko drilling program we have added this drilling project.  The model results should be considered tentative at this time pending new data pertaining to well EUR and cost.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 02 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Deepwater Mozambique Gas Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5051</link>
      <description>The field has been added to the database but a cash flow model will be delayed because of the highly speculative nature of the possible development.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 02 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Greater Natural Buttes DP General Information Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4605</link>
      <description>Based on Anadarko's 2010 10K we have revised our prior estimate of wells in 2010 down from 300 to 263 and updated 2011 estimated wells to 250 from 300 based on the company's Investor Presentation on 2/24/2011.  Wells drilled in 2009 were also downgraded based on data provided in the 2010 10K.  2009 wells were previously estimated based on the company's plans as announced in mid 2009.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 02 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yamal LNG Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4916</link>
      <description>Total has been added as a 20% partner.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 02 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Marcellus Shale DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4815</link>
      <description>Per Anadarko's 2010 10K, completed well estimates have been upgraded significantly to 22 operated and 110 non-operated wells.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 02 Mar 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Rochelle Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4521</link>
      <description>Following approval of the plan of development the field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 28 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ensign Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4527</link>
      <description>Project status was upgraded from concept to construction following award of subsea facilities contract.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 25 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>York Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5046</link>
      <description>The field has been added as part of ongoing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 25 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Eagle Ford DP Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5040</link>
      <description>Based on Anadarko's Investor Presentation on 2/24/2011 we have upgraded total EUR estimates per well.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Eagle Ford DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5040</link>
      <description>Based on Anadarko's Investor Presentation on 2/24/2011 we have increased 2011 wells to 200, a 62% increase over previous estimates.  Using this well rate as a guide we have accelerated the long-term drilling program from 20 years to 15 years based on existing 400,000 gross acreage position.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Wattenberg DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4607</link>
      <description>The 2011 well count has been increased to reflect Anadarko's plans as reported in its Investor Presentation 2/24/2011.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Wattenberg Refrac General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4608</link>
      <description>Wells drilled in 2011 have been updated for plans as announced by Anadarko in its Investor Presentation 2/24/2011</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Marcellus Shale DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4815</link>
      <description>Based on Anadarko's Investor Presentation 2/24/2011 we have increased estimated 2011 wells to 250 from 150.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Perla Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4993</link>
      <description>Based on results of appraisal drilling and published estimates of Phase 1 output this field has been added.  Production volumes are likely to be increased substantially when or if the partners proceed to a full field development.  Also, it is expected that PDVSA will opt to exercise its back in rights for a 35% interest at which time ENI and Repsol's shares will fall from 50/50 to 32.5% each.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Caesar/Tonga Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4079</link>
      <description>Anadarko announced on 2/24/2011 that first oil is expected in 2012.  Previous estimates provided by Chevron in March 2010 indicated a planned startup in 2011.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BG-Exco Haynesville Shale DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4665</link>
      <description>Based on results reported by BG in its 2011 Strategy presentation, we have increased the planned drilling program from 2011 through 2015.  Unit operating cost has also been increased based on BG reported results for the Haynesville.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tamar Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4586</link>
      <description>Noble announced an estimated 8.4 Tcf gross gas reserves in a February 2011 Credit Suisse Presentation</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>KG-D6 Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4499</link>
      <description>BP has acquired 30% of Reliance's interests in the field as part of the larger US$7.2 billion acquisiiton of interests in 23 Reliance blocks in India.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP/Chesapeake Fayetteville Shale Drilling Program Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4300</link>
      <description>BHP Billiton has acquired all of Chesapeake's Fayetteville Shale assets.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 21 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Qatargas 4 Gas Supply Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3493</link>
      <description>Project status was upgraded from construction to producing following load of first LNG cargo.</description>
      <category>Prism Update</category>
      <pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Monument Butte Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4165</link>
      <description>We have revised the drilling program estimates used by GES to project 2010 operations to reflect Newfield actual results.  Also, using Newfield's recent results announcement, we have been able to identify total well locations and have expanded the long-term drilling program accordingly.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Itau Phase 1 Ownership Change Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4596</link>
      <description>Total sold a 4% share to YPFB and a 30% share to Petrobras on 2/1/2011.  Petrobras assumes operatorship.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Itau Phase 1 Operator Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4596</link>
      <description>Total sold a 4% share to YPFB and a 30% share to Petrobras on 2/1/2011.  Petrobras assumes operatorship.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Nikaitchuq Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4175</link>
      <description>The field has entered production and has been upgraded from construction status.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 09 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Nikaitchuq Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4175</link>
      <description>Field reserves have been upgraded to 220 mmbbls based on ENI statements</description>
      <category>Prism Update</category>
      <pubDate>Wed, 09 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>34/10-53 S Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5043</link>
      <description>Based on announcements from Statoil the field was added.  Field model results are preliminary and are based on multiple estimates.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 09 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petrochina Encana Cutbank DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5044</link>
      <description>This field has been added as part of the continuing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 09 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kogas EnCana Montney DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5045</link>
      <description>This field has been added as part of the continuing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 09 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP/Chesapeake Fayetteville Shale Drilling Program Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4300</link>
      <description>Per well drilling &amp; completion costs have been revised to reflect recent Chesapeake estimates.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 08 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mackenzie Gas Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2859</link>
      <description>Total project cost has been increased from US$14 billion to US$16.2 billion.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 08 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anadarko Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5040</link>
      <description>The field has been added as part of the continuing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 02 Feb 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CHK CNOOC Niobrara DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5039</link>
      <description>Based on information provided in the announcement of the CNOOC/CHK JV we have added the field.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Sour Gas Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4568</link>
      <description>Based on an announcement in Oxy's 4th quarter 2010 earnings release, we have increased liquids output from 33 to 50 mb/d.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 27 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Miran Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5035</link>
      <description>Based on data provided by Heritage Oil following the announced results of the Miran West-2 well we have added this field.  Cash flow model results are subject to future revision as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 26 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Golden Eagle Development Area Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5034</link>
      <description>The field has been added using data from the EIS filed by Nexen in December 2010.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 25 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Montara Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5033</link>
      <description>The field has been added as part of the continuing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Corrib Decline Rates Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3023</link>
      <description>Based on recently released data we have increased the expected decline rate after plateau to 20%.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Akkas Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5030</link>
      <description>This field has been added to the database.  However, economic results from the cash flow model should be considered tentative at this time pending further information on the project and the specific terms of the service agreement.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 21 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Umiak Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4955</link>
      <description>Korea Gas is acquiring a 20% working interest from MGM Energy</description>
      <category>Prism Update</category>
      <pubDate>Fri, 21 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pan-Pandora (Visund South) General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4846</link>
      <description>Based on POD submitted by Statoil we have updated the planned startup date, made a minor revision to estimated reserves, and added capital spending estimates.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 21 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mansouriya Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5031</link>
      <description>The field has been added following awards.  The economic model results are tentative at this time pending further information.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 21 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Siba Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5032</link>
      <description>This field has  been added following awards.  The economic models are tentative at this time due to limited data.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 21 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Sour Gas Ownership Change Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4568</link>
      <description>Oxy will take the 40% share that ConocoPhillips relinquished.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 20 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Turrum Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2750</link>
      <description>The projected capital cost of the project has been more than doubled due to what BHP Billiton referred to as design changes and offshore hook up work.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 20 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Turrum Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2750</link>
      <description>BHP Billiton announced that the startup year has been pushed back from 2011 to 2013.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 20 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kipper/Tuna Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2725</link>
      <description>BHP Billiton reported that expected costs have increased by 80% due to mercury encountered in the reservoir during development drilling and the resulting need for mercury mitigation project.  ExxonMobil also attributed the increase to significantly higher labor rates.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 20 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kipper/Tuna Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2725</link>
      <description>BHP Billiton reported that expected startup has been pushed back from 2011 to 2012 due to mercury encountered in the reservoir during development drilling and the resulting need for mercury mitigation project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 20 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Stone Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5027</link>
      <description>Based on Stone's announced spending plans for 2011, this drilling program project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 19 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Goodrich Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5028</link>
      <description>This drilling program has been added as part of the continuing program of expanding Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 19 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>In Salah Capital Cost</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2608</link>
      <description>Petrofac was awarded a US$1.2 billion contract for development of southern fields to maintain output past 2013.  Full cycle project economics have been updated to include the costs of this phase of the investment program.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 18 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gladstone LNG Gas Supply Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4786</link>
      <description>Following announcement that an FID has been taken, the project status has been updated from FEED to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 13 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Athena Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4549</link>
      <description>Delayed by one quarter.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 12 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jambi Merang Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5023</link>
      <description>The field was added after Talisman reported estimates of planned startup.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 12 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alen Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5024</link>
      <description>Following project sanction, this field has been added to the database.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 12 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Balboa Added Field Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5025</link>
      <description>The field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 12 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Newfield TXCO Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5022</link>
      <description>Based on results of Newfield 2010 assessment program this field has been added as a drilling program.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 11 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Barzan Phase I Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3489</link>
      <description>Following award of a contract to Hyundai Heavy Industries for offshore facilities we have upgraded project maturity to construction.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 11 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubular Bells Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4226</link>
      <description>Based on a Hess announcement that engineering and design work is progressing we upgraded the project from appraisal to FEED.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 07 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cernambi (Iracema) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5021</link>
      <description>Based on approval of an FPSO, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 07 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Legendre Project Maturity Progression</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5018</link>
      <description>The field has been shut down pending decomissioning.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 03 Jan 2011 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ebok Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4503</link>
      <description>Based on Afren reports on project status, startup has been delayed until 2011.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 23 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ebok Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4408</link>
      <description>Based on reports from Afren on project status, startup is not expected until February 2011.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 23 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>South Yoloten Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5026</link>
      <description>Following award of a US$3.4 billion contract to build the processing facilities the field has been tentatively added.  More data are required before a model of the project is prepared.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 22 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Abadi (Masela Block) Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4373</link>
      <description>Inpex has reported that startup of the Abadi Floating LNG project will be delayed from it prior expectation of 2016.  We have assumed a one year delay.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Abadi (Masela Block) Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4373</link>
      <description>The Indonesian government's approval of the Abadi LNG project included a scaleback in initial volumes from 4.5 mmtpa LNG to 2.5 mmtpa LNG.  This implies that initial output feed to the liquefaction facilities will fall from 660 Mmcf/d to 370 Mmcf/d.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jubarte (P-57) Start Year Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2784</link>
      <description>Petrobras announced that initial production from two wells started on 12/17/2010.  This moves startup slightly from a prior estimate of 2011.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cardamom Deep Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5016</link>
      <description>Following award of subsea facilities contract to FMC, the project has been added.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 20 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gladstone LNG Gas Supply Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4786</link>
      <description>Total acquired an additional 7.5% interest in the project from Santos.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gladstone LNG Gas Supply Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4786</link>
      <description>Korea Gas acquired a 15% interest in the project split equally from Santos' and Petronas' shares after the Total acquisition.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gladstone LNG Gas Supply Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4786</link>
      <description>Based on Total's announcement that FID will occur in January 2011, startup is now expected from the first train in 2015.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn Mining Full Field Development Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2843</link>
      <description>Suncor acquired a 36.75% interest in an asset swap with Total.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn Mining Phase I (North Mine) Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2844</link>
      <description>Suncor acquired a 36.75% interest from Total in a swap.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn Mining Phase II Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2845</link>
      <description>Suncor acquired a 36.75% interest from Total in an asset swap.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn Mining Phase III Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2846</link>
      <description>Suncor acquired a 36.75% interest from Total in an asset swap.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn Mining Phase IV Operator Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2847</link>
      <description>Suncor acquired a 36.75% interest in an asset swap with Total.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn SAGD Phase I Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2848</link>
      <description>Suncor acquired a 36.75% interest after an asset swap with Total.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn SAGD Phase II Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2849</link>
      <description>Suncor acquired a 36.75% interest following an asset swap with Total.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn SAGD Phase IIIA Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2850</link>
      <description>Suncor acquired a 36.75% interest in an asset swap with Total.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Joslyn SAGD Phase IIIB Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2851</link>
      <description>Suncor acquired a 36.75% interest in an asset swap with Total.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Fort Hills Phase 1 Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4341</link>
      <description>Total acquired an additional 19.2% interest in a swap deal with Suncor.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Fort Hills Phase 1 Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4341</link>
      <description>Total announced plans for startup in early 2016.  We had previously estimated a 2015 startup date.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gudrun Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3396</link>
      <description>Marathon has sold its 20% interest in Gudrun to Statoil.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 16 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Big Foot Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=1651</link>
      <description>Project status as be upgraded to construction following Chevron's announcement of an FID.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 16 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Big Foot Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=1651</link>
      <description>The year of first production was announced by Statoil to be 2014.  We had previously estimated a 2013 startup.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 16 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Big Foot Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=1651</link>
      <description>Chevron reported reserves in excess of 200 mmboe in its announcement of FID.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 16 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jubilee Phase 1 Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4365</link>
      <description>Phase 1 progress was upgraded to producing.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 15 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>RDS S. Tx. DP Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4198</link>
      <description>In a US$1.8 billion deal Oxy acquired Shell's interests.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 10 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Oxy Bakken DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5011</link>
      <description>Following the Oxy acquisition of 180,000 net acres in the Bakken play this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 10 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Blackbird Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5013</link>
      <description>Following announcement of FID, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 10 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>RDS S. Tx. Legacy Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4939</link>
      <description>Oxy acquired Shell's interest in the field.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 10 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Macedon Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4562</link>
      <description>Based on recent announcements we have increased the estimated development cost to US$1.5 billion.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 09 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Macedon Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4562</link>
      <description>Based on recent contract awards we have upgraded project status to construction.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 09 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Marlin Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4154</link>
      <description>Increased BP's interest following its pre-emption of the W &amp; T acquisition.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Dorado Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4352</link>
      <description>Increased BP's interest following its pre-emption of the W &amp; T acquisition.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Dorado Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4352</link>
      <description>Shell sold its interest to W&amp;T Offshore.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 03 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Marlin Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4154</link>
      <description>Shell sold its interest to W&amp;T Offshore.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 03 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tahoe Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4215</link>
      <description>Shell sold its interest to W&amp;T Offshore.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 03 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pluto LNG Train 1 Gas Supply Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2741</link>
      <description>Start up has been delayed from March to August 2011 due to remedial work required on the flare towers.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 03 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Antero-Bluestone Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5010</link>
      <description>Following Antero's acquisition of Bluestone Energy Partners we have added a supplemental project associated with the Marcellus acreage in the deal.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 03 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vega Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4452</link>
      <description>The field entered production.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 02 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gendalo Hub Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2996</link>
      <description>The project has moved out of the conceptual phase with the award by Chevron of FEED contracts.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 02 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gendalo Hub General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2996</link>
      <description>Based on information at the time of the FEED contract award, we have identified the production system as an FPU.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 02 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gendalo Hub Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2996</link>
      <description>Based on reports by Dow Jones, Sinopec will acquire an 18% interest in the project from Chevron.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 02 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Qatargas 3 Gas Supply Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3492</link>
      <description>First LNG was shipped to Canaport in New Brunswick.  Project maturity updated from construction to producing.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 01 Dec 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>West Franklin Phase 2 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5008</link>
      <description>Following Total announcement, this field has been added to new projects.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 30 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>MRO-Denali Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5007</link>
      <description>Marathon has acquired an interest in 17,000 net acres out of 75,000 net acres held by Denali.  Working interests are subject to change in 2011 since, under the deal structure, Marathon has the option to acquire the full 75,000 net acres held by Denali.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 29 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hess-TRZ Energy Bakken DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5006</link>
      <description>The drilling program model has been added following the Hess acquisition of 167,000 net Bakken acres from TRZ Energy LLC.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 23 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bacchus Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4938</link>
      <description>Endeavour acquired Shell's 20% interest.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 23 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Junin Block 5 Peak Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4249</link>
      <description>Based on information published at the time contracts for the formation of the Empresas Mixtas, we have revised our prior estimate of peak year output from 2016 to 2018.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 23 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Junin Block 5 Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4249</link>
      <description>With signing of contracts for the Empresa Mixtas and plans for major contract awards in 2011, we have upgraded project maturity from concept to feed.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 23 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kai Kos Dehseh Phase I Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2852</link>
      <description>PTT has acquired a 40% interest.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 23 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kai Kos Dehseh Phase II Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2853</link>
      <description>PTT has acquired a 40% interest.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 23 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SHWE Capital Cost</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4841</link>
      <description>It was reported by Dow Jones on 11/18/2010 that the Myanmar section of the gas export pipeline will cost US$2.15 billion.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mariscal Sucre Dragon and Patao Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5003</link>
      <description>The project has been added to the database.  Model development will be completed as more data are available.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Williams Bakken DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5004</link>
      <description>This project was added following the announcement that Williams Companies had acquired 85,800 net acres in the Bakken play.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Smørbukk North-East Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5005</link>
      <description>Development moved up from 2013 to late 2011</description>
      <category>Prism Update</category>
      <pubDate>Wed, 17 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Newfield Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5014</link>
      <description>Following Newfield's acquisition of 50,000 net Marcellus acres from EOG, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 16 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Katla (Stjerne) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4843</link>
      <description>This field was added after contracts were awarded.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pan-Pandora (Visund South) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4846</link>
      <description>This field was added as a result of contract awards.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 12 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>MRO Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4999</link>
      <description>This drilling program model was added as part of continuing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 11 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tamarack Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4379</link>
      <description>POD filing indicated near year end 2013 possible start of production from Phase 1.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 08 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gjøa Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3392</link>
      <description>Maturity advanced from construction to producing based on STO PR announcing production startup on 11/7/2010.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 08 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Droshky Capital Cost Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4107</link>
      <description>Based on a Marathon presentation on 11/8/2010 we have reduced the capital cost.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 08 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sangu Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4545</link>
      <description>Cairn sold its interest to Santos.  Cairn has exited Bangladesh.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 05 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Sangu Operator Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4545</link>
      <description>Cairn sold its interest to Santos.  Cairn has exited Bangladesh.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 05 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ConocoPhillips Eagle Ford Shale DP Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4961</link>
      <description>ConocoPhillips announced plans to increase Eagle Ford spending in 2011 to between US$1 and US$1.5 billion from US$300 million in 2010.  The resulting acceleration of the company's drilling program relative to our prior estimates has caused us revise the drilling program duration from 20 to 12 years.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 01 Nov 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alur Siwah-Alur Rambong (Block A Aceh) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4996</link>
      <description>Following 20 year extension of PSC, we have added these discovered but undeveloped fields.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 29 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pungarayacu (Block 20) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4995</link>
      <description>The field has been tentatively added to the database.  Development of a cash flow model is premature due to insufficient information at this time.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Edvard Grieg (Luno) Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4822</link>
      <description>Lundin announced that it had upgraded 2P reserve estimates from 95 to 149 mmboe (136.7 mmbbls oil)</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Blane Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3671</link>
      <description>Faroe Petroleum acquired ENI's 18% interest in the field.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 26 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Magnolia Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4151</link>
      <description>BP sold its interest as part of a deal with Marubeni.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Independence Hub Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4132</link>
      <description>BP sold its 50% interest in Merganser which is part of Independence Hub to Marubeni.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Nansen Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4170</link>
      <description>BP sold its interest to Marubeni.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 25 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Valemon Reserves</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3459</link>
      <description>Updated reserve estimates following Statoil's submission of a POD.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Valemon Start Year Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3459</link>
      <description>Revised prior 2016 startup estimate to 2014 per Statoil POD.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ogini Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3301</link>
      <description>First Hydrocarbon Nigeria (45% owned by Afren) acquired the combined 45% interest previously held by Shell, Total and ENI.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Isoko Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3241</link>
      <description>First Hydrocarbon Nigeria (45% owned by Afren) acquired the combined 45% interest previously held by Shell, Total and ENI.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ogini-Isoko Redevelopment (OML 26) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4994</link>
      <description>This redevelopment project was added following the acquisition of Shell, Total and ENI interests in the two fields.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 22 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jack/St. Malo Project Maturity Progression</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4134</link>
      <description>Chevron has sanctioned the development of the integrated development of Jack and St. Malo fields.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 21 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cerro Negro Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4242</link>
      <description>BP sold its interest to TNK BP.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 18 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Boqueron Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4318</link>
      <description>BP sold its interest to TNK BP.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 18 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Desarrollo Zulia Occidental (DZO) Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4319</link>
      <description>BP sold its interest to TNK BP.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 18 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Maari Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3113</link>
      <description>Based on discovery and startup of production from Manaia-1 well at 4 mb/d reserve estimates were doubled to 100 mmbbls.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 12 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CNOOC-CHK Eagle Ford Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4991</link>
      <description>Following the announcment of a JV alliance between CNOOC and Chesapeake, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>STO-TLM Eagle Ford Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4992</link>
      <description>Following announcement of the JV agreement with Talisman, this field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 11 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Juliet Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4980</link>
      <description>Hansa Hydrocarbons acquired 19% from First Oil Expro by contributing some unknown portion of First Oil Expro's share of development costs.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 05 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Carioca Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4988</link>
      <description>The field was added as follow-up to the Sinopec deal with Repsol.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 04 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubular Bells Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4226</link>
      <description>Working interests changed to reflect Hess purchase of 20% from BP</description>
      <category>Prism Update</category>
      <pubDate>Fri, 01 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tubular Bells Operator Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4226</link>
      <description>Hess takes over operatorship from BP following purchase of 20% working interest.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 01 Oct 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ruby Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4987</link>
      <description>Following up on Total farm in to Sebuku block we have added the Ruby gas field project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 30 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mars B Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4986</link>
      <description>Following Shell announcement that FID had been achieved the field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 29 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Oselvar Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4375</link>
      <description>Noreco sells its working interest to Marubeni.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 29 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Athena Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4549</link>
      <description>Following POD approval Ithaca stated startup is likely by 3rd quarter 2011; this is a delay from a prior stated plan of mid-year 2011</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Athena Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4549</link>
      <description>Following POD approval we upgraded project maturity to construction.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 21 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Statfjord Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3439</link>
      <description>Incorporated the effects of Shell's sale of its interest to Centrica.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 17 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jackpine Phase 1A Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2840</link>
      <description>The project moved from construction to first output.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 15 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gladstone LNG Gas Supply Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4786</link>
      <description>Following the announcement of Total's buy in to the project Petronas' and Santos' working interests have been reduced and Total has been added as a 20% working interest partner.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 09 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bemolonga Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4985</link>
      <description>Following up on Total's presentation we have added this field to the database.  It is too early yet to generate a model.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 09 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cavalo/Marinho Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2775</link>
      <description>Based on a Panoro presentation startup is not expected until 2014 with FID planned in last half 2011.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kenarong/Pertang Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3069</link>
      <description>Due to continuing lack of progress on this project we have revised our models to delay startup until 2012.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 08 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Mengo-Kundji-Bindi Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4984</link>
      <description>Based on a Panoro Presentation 9/2/2010 we have added this project.  It is in a pilot phase and, therefore, we have not yet added a model to Prism.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 07 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hebron Project Maturity Progression</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4355</link>
      <description>Following award of topsides FEED to Worley Parsons this project was upgraded from Concept to FEED status.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 01 Sep 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Andrew Lower Cretaceous Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4982</link>
      <description>The cash flow model for this development tapping gas and condensate below the main Andrew reservoir was added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 31 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Clipper South Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4812</link>
      <description>Fairfield Energy sold a 25% WI to Bayernagas</description>
      <category>Prism Update</category>
      <pubDate>Tue, 31 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Halyard Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4726</link>
      <description>Santos reported startup likely by mid 2011 -- a one year delay from earlier estimates</description>
      <category>Prism Update</category>
      <pubDate>Tue, 31 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Halyard Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4726</link>
      <description>Santos reported 335 PJ gross gas reserves</description>
      <category>Prism Update</category>
      <pubDate>Tue, 31 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cygnus Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4528</link>
      <description>Endeavour Energy sold its 12.5% wi to Bayerngas</description>
      <category>Prism Update</category>
      <pubDate>Tue, 31 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Wei 6-12 and Wei 6-12 South Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2912</link>
      <description>CNOOC backed in for a 51% WI reducing the other companies' shares.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 25 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ACG Original Oil (Chirag) Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2757</link>
      <description>The BP purchase of Devon's interest in the ACG assets was pre-empted by Chevron, Inpex and Itochu</description>
      <category>Prism Update</category>
      <pubDate>Mon, 16 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ACG Phase 1 (Central Azeri) Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2758</link>
      <description>The BP purchase of Devon's interest in the ACG assets was pre-empted by Chevron, Inpex and Itochu</description>
      <category>Prism Update</category>
      <pubDate>Mon, 16 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ACG Phase 2 (East &amp; West Azeri) Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2759</link>
      <description>The BP purchase of Devon's interest in the ACG assets was pre-empted by Chevron, Inpex and Itochu</description>
      <category>Prism Update</category>
      <pubDate>Mon, 16 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ACG Phase 3 (Deepwater Gunashli) Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2760</link>
      <description>The BP purchase of Devon's interest in the ACG assets was pre-empted by Chevron, Inpex and Itochu</description>
      <category>Prism Update</category>
      <pubDate>Mon, 16 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chirag Oil Project Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4362</link>
      <description>The BP purchase of Devon's interest in the ACG assets was pre-empted by Chevron, Inpex and Itochu</description>
      <category>Prism Update</category>
      <pubDate>Mon, 16 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Block 17 - CLOV Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2632</link>
      <description>In a press release dated 8/11/2010 Total announced that drilling will commence in 2012 with first oil planned in 2014.  This delays startup by one year from prior estimates.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 11 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tamar Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4586</link>
      <description>The POD has been approved for Tamar.  In the announcement of this event Noble indicated a startup by late 2012.  We had previously been assuming startup in mid-2012.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 10 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Juliet Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4980</link>
      <description>We have added this field which just entered FEED.  However, due to insufficient data at this time, we have not prepared a cash flow model.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 10 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Greater Stella Area (GSA) Stella-Harrier-Hurricane Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4976</link>
      <description>Based on information provided in Ithaca's August 2010 presentation we have added this field.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 09 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BZ 19-4 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4977</link>
      <description>The field was added following announcment of startup</description>
      <category>Prism Update</category>
      <pubDate>Mon, 09 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Williams/Rex Marcellus Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4978</link>
      <description>This project has been added as part of a continuing program of expansion of our coverage of unconventional gas and independent oil and gas producers.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 09 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Williams/Alta Marcellus Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4979</link>
      <description>This project has been added as part of a continuing program of expansion of our coverage of unconventional gas and independent oil and gas producers.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 09 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Breagh Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4811</link>
      <description>Following award of platform contract the field's status has been updated to construction.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 09 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Clipper South Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4812</link>
      <description>The likely startup of the field has been delayed a few months from late 2011 to early 2012.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 09 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Issungnak Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4973</link>
      <description>The field has been added to the database but a cash flow model will not be developed at this time since development will be a subsequent add on to the Mackenzie Gas Project.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 06 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Entrada Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4112</link>
      <description>ATP won the lease to GB 782 containing Entrada in Central Sale 213 held in March 2010.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 06 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Reliance Carrizo Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4972</link>
      <description>The project has been added to Prism following the announced deal in which Reliance will acquire a positon in the Marcellus shale gas play.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 05 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Topaz Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4551</link>
      <description>Ithaca acquired GDF Suez interests in Topaz and Anglia.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 04 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Anglia Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3639</link>
      <description>Ithaca acquired GDF Suez interests in Topaz and Anglia.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 04 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>V. Filanovsky Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3556</link>
      <description>Based on Lukoil's 2011 Fact Book planned peak output has been increased from 160 to 210 Mb/d.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 03 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>EOG Eagle Ford Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4968</link>
      <description>EOG Eagle Ford assets have been added as part of an ongoing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 03 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>EOG Bakken DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4969</link>
      <description>This drilling program was added as part of our continuing expansion of Prism coverage to independents and the unconventional plays.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 03 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>EOG Haynesville Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4970</link>
      <description>This program has been added as part of a continuing expansion of Prism coverage of independent producers and unconventional oil and gas plays.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 03 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Petrohawk Haynesville Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4971</link>
      <description>The company's drilling program was added as part of an ongoing expansion of Prism coverage.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 03 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Morvin Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3412</link>
      <description>The Morvin field began producing from the first well on August 2, 2010.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 02 Aug 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ConocoPhillips Bakken DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4967</link>
      <description>The drilling program was added.  Results are based on wells drilled on 240,000 acres over a twenty year period.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ConocoPhillips Eagle Ford Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4961</link>
      <description>ConocoPhillips holds 240,000 net acres in the play.  We have added the field assuming that the company will exploit this acreage over a twenty year drilling program.  Future revisions in the rate of drilling compared to our initial case assumptions are likely to occur.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hess Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4966</link>
      <description>Hess acquired 80,000 net acres in the play.  We have added the project but classified it at an appraisal stage of maturity.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hess Bakken Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4827</link>
      <description>This long-term development project has been added.  Hess anticipates costs of US$5 billion over a five year period to increase Bakken shale oil output from 10 to 80 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Seminole San Andres Unit Residual Oil Zone (ROZ) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4580</link>
      <description>This field was added.  Significant estimates of unavailable data were made.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Block 17 - CLOV Project Maturity Progression</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2632</link>
      <description>The CLOV field in Angola has progressed to the construction phase with the EPIC award to Acergy on July 29, 2010.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>MRO Piceance DP Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4301</link>
      <description>Based on company revisions to its announced well completion schedules, we have reduced the rate of drilling over the next five years and eliminated previously announced long-term plans.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>MRO Bakken DP General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4302</link>
      <description>Based on company reports of fewer than previously expected near-term wells, we have revised the number of wells drilled.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>MRO Woodford Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4962</link>
      <description>Based on new data reported by Marathon we have added the company's Anadarko Basin Woodford Shale drilling program model.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BZ 29-4 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4959</link>
      <description>The field was added following a CNOOC announcement.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 22 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>West Nile Delta North Alexandria-West Mediterranean Deep Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4956</link>
      <description>Following agreement between BP and the Egyptian government, the project will proceed.  We have added the field.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 20 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bualuang Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4957</link>
      <description>Data on the field became available at the time SOCO announced its planned sale to Salamander.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 20 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Droshky Start Year Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4107</link>
      <description>Marathon announced startup of phase 1 of the Droshky project.  We have accelerated startup in the database and models from previous estimate of late 2010 to July 2010.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 19 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Umiak Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4955</link>
      <description>Based on ConocoPhillips Investor Presentation, the field has been added.  Development is contingent on the Mackenzie Gas project moving forward and this field should be considered a satellite of Mackenzie Gas.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 16 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Lavrans Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4949</link>
      <description>The field was added based on Statoil's 2010 presentation and the NPD 2010 Facts publication release.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Peon Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4950</link>
      <description>The field was added based on Statoil's 2010 presentation and the NPD 2010 Facts publication release.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Astero Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4951</link>
      <description>The field was added based on Statoil's 2010 presentation and the NPD 2010 Facts publication release.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Islay Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4952</link>
      <description>The field was added following announcement that the POD had been approved by both the UK and Norwegian governments.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Urugua-Tambau Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4953</link>
      <description>Petrobras announced startup of production from the field.  We have added it to the database and cash flow models.  However, a number of data items have been estimated.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Prudhoe WRD Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4192</link>
      <description>COP Investor Presentation 3/24/2010 indicates post 2014 startup.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 15 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cupiagua Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2919</link>
      <description>Ecopetrol assumed ownership of the field after the contract expired.  BP and Total working interests changed to zero.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cupiagua Operator Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2919</link>
      <description>Ecopetrol assumed ownership of the field after the contract expired.  BP and Total working interests changed to zero.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cusiana Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2920</link>
      <description>Ecopetrol assumed ownership of the field after the contract expired.  BP and Total working interests changed to zero.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cusiana Operator Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2920</link>
      <description>Ecopetrol assumed ownership of the field after the contract expired.  BP and Total working interests changed to zero.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chayanda Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4948</link>
      <description>Gazprom announced plans to develop Chayanda in the Republic of Sakha (Yakutia).  Due to insufficient data, the cash flow model for this field is not yet available.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cygnus Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4528</link>
      <description>Based on GDF Suez press release, FID is expected in 2011 with startup in 2013.  The original EIS indicated a startup in 2010.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Cygnus Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4528</link>
      <description>Based on GDF Suez press release 7/8/2010 recoverable reserves are estimated at 500 bcf (up from 110 bcf in early EIS).</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Etim/Asasa Pressure Maintenance Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4487</link>
      <description>Based on ExxonMobil's 2009 Fact Book, we have delayed the start of production until 2013.  In the 2008 Fact Book ExxonMobil indicated startup in 2010/2011 time frame.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kizomba C Mondo South Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4944</link>
      <description>Based on information provided by ExxonMobil in its 2009 Fact Book we have added this field.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Luva Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4945</link>
      <description>Based on information from the NPD Facts 2010 and ExxonMobil's 2009 Fact Book we have added this field.  However, due to the highly speculative nature of the asset we have not incorporated this potential project into the projections.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kearl Phase I Peak Output Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2855</link>
      <description>Based on ExxonMobil's 2009 Fact Book, Phase 1 peak output has been increased from 110 to 140 Mb/d.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bosi Oil Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3178</link>
      <description>Based on ExxonMobil's 2009 Fact Book, we have moved the start year for Bosi oil from 2011 to 2013.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Fort Hills Phase 1 Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4341</link>
      <description>Total will acquire UTS Energy's 20% stake in the project.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Jul 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP Haynesville Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4942</link>
      <description>Following the BP announcement that it holds 150,000 net acres in the Haynesville shale play we have added this asset.  The drilling program model uses the premises outlined by XTO in its acreage adjusted for the higher acreage position held by BP.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 30 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kinnoull Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4943</link>
      <description>The field was added following review of information from BP's Analyst presentation in 2010.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 30 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>RDS S. Tx. Legacy Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4939</link>
      <description>The asset has been added based on research into Shell's legacy US onshore gas position.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 28 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bacchus Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4938</link>
      <description>Following approval of the EIS, this project was added.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 28 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gaupe (Pi) Project Maturity Progression</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4824</link>
      <description>Project status has been upgraded to construction following Norwegian approval of the development plan.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 28 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>RDS Pinedale Legacy Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4937</link>
      <description>This asset was added following research into Shell's US gas legacy asset position and collection of information concerning their drilling activities in the period following the McMurry Energy acquistion of Pinedale gas acreage in late 2001.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 25 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Pioneer Eagle Ford Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4936</link>
      <description>Following up on the Reliance acquisition of a postion in Pioneer's Eagle Ford shale acreage we have added this project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 24 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BG Exco Common Resources Haynesville Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4935</link>
      <description>Project was added following closing of the acquisition from Common Resources LLC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 23 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Exco SWN Haynesville Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4934</link>
      <description>The project was added following the announcement that BG and Exco will acquire the Southwestern Haynesville Shale acreage rights.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 22 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Carabobo Project 3 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4829</link>
      <description>The project was added to the database.  The cash flow model currently assumes startup of production in 2014.  However, this is speculative at this time.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gudrun Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3396</link>
      <description>Following POD approval the project has been updated from FEED to construction.  Some contracts have already been awarded.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Gudrun Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3396</link>
      <description>The agreement is a pure exchange between Statoil and Marathon Petroleum Norge in which Statoil receives 8.2% of Gudrun/Sigrun (PL 025) and Marathon Petroleum Norge receives 10% of the Brynhild prospect (PL 187) and 12.5% of the 15/5-2 find (PL 048) west of Sleipner.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shouyang Block CBM Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4931</link>
      <description>Added field to database following signature of gas sales agreement.  Cash flow model pending.  Additional information required to build the drilling program model assumptions.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 16 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Columbus Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4928</link>
      <description>Agreement has been reached to begin FEED for Columbus/Arran tieback to Lomond.  Serica reported an estimated 9 mmboe 2P reserves.  We have used this to estimate total boe reserves and allocated reserves to gas and condensate based on the production rates in the discovery well.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vito Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4930</link>
      <description>Based on appraisal well results and RDS 2009 AR Supplement we have added this field to the database.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 15 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Rubiales Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4927</link>
      <description>Following the release of additional information we have added the field to the database.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 14 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SuTu Den NE Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4260</link>
      <description>SuTu Den NE started production on 9 June 2010</description>
      <category>Prism Update</category>
      <pubDate>Wed, 09 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BG Exco Marcellus DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4924</link>
      <description>Major Marcellus Shale Drilling program was added following Exco announcement that the JV with BG had closed.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 07 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SHWE Project Maturity Progression</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4841</link>
      <description>CNPC has started construction of planned pipeline.  Project maturity has been upgraded from FEED to Construction.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 07 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>RDS/East Resources Marcellus Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4922</link>
      <description>Shell's acquisition of East Resources added 650,000 net Marcellus acres.  A drilling program model for this acreage has been added to the database and a cash flow model has been created.  Pending further information, we have assumed that the estimated number of wells will be spread over a 15 year period.</description>
      <category>Prism Update</category>
      <pubDate>Sun, 06 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Callisto Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4921</link>
      <description>Based on Anadarko announcement 6/3/2010 we have added Callisto to the database.  A cash flow model is complete assuming an end of September 2010 production startup.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 03 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Tamar Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4586</link>
      <description>Based on estimates provided by Noble, recoverable gas reserves were upgraded to 6,500 bcf.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 03 Jun 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>North Amethyst Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4357</link>
      <description>Production Startup</description>
      <category>Prism Update</category>
      <pubDate>Mon, 31 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Huntington Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4404</link>
      <description>Based on Noreco Presentation and LOI with Sevan Marine we have upgraded this project from appraisal to concept status.  Given the LOI it is likely that a move to FEED will occur soon.  PDO is expected by Noreco in last half 2010.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 28 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Brynhild (Nemo) Capital Cost Deflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4821</link>
      <description>In its Jan 2010 Capital Markets Day presentation Noreco estimated the cost will range from NOK 3,000 to 4,000 mm.  The previous estimated was NOK 4,000 mm.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 28 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Devenick Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4920</link>
      <description>BP submitted an EIS in early March 2010.  We have added the field to the database and a model has been constructed.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 25 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ichthys Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2722</link>
      <description>SEE RSS</description>
      <category>Prism Update</category>
      <pubDate>Mon, 24 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CVX Piceance Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4099</link>
      <description>In the supplement to its 2009 Annual Report CVX indicated that the Piceance drilling program will be spread over a 30 to 40 year period.  This compares to the planned 15 to 20 year drilling program announced in the 2007 supplement to the annual report.</description>
      <category>Prism Update</category>
      <pubDate>Sat, 22 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>CVX Piceance Peak Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4099</link>
      <description>In the supplement to its 2009 Annual Report CVX indicated that the Piceance drilling program will be spread over a 30 to 40 year period.  This compares to the planned 15 to 20 year drilling program announced in the 2007 supplement to the annual report.</description>
      <category>Prism Update</category>
      <pubDate>Sat, 22 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Peregrino Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2801</link>
      <description>Statoil agreed to sell a 40% WI to Sinopec.  We have revised Statoil's interest down to 60% and added Sinopec as a 40% partner.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 21 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kitan Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4347</link>
      <description>The POD was approved in May 2010.  ENI is reported by OGJ to expect startup in the second half of 2012.  Previous estimates suggested a 2011 startup.  We have delayed the startup by one year.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 19 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Arran (Barbara-Phyllis) Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4918</link>
      <description>The field is progressing into FEED as of early 2010.  As a result we have added the asset in preparation for modeling.  Unitized working interests are unclear at this time.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 12 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yamal LNG Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4916</link>
      <description>Following award of a contract to CB&amp;I for concept development services we have added this field (South Tambey) to the Prism database.  At this time there is insufficient data to warrant construction of a cash flow model.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 07 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Basra Gas Development Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4914</link>
      <description>The potential gas development project centered in Basra has been added because a draft agreement was reported to have been sent to the Iraqi Parliament for approval.  A cash flow model has not been prepared at this time due to insufficient information.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 07 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Belinda Gas Recycling Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4830</link>
      <description>Project maturity was updated to FEED status following a contract awarded to Mustang.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 07 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kebabangan Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3068</link>
      <description>Aker was awarded a 4 year engineering contract for the development project and announced concept and FEED work was done.  We upgraded the project from concept to construction.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 06 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alaskan Natural Gas Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4602</link>
      <description>The project has previously not been included due to uncertainty concerning viability.  We have added it, despite the continuing high level of uncertainty because of its potential importance.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 05 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Valemon Start Year Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3459</link>
      <description>The partners in the Valemon field announced an acceleration of development by 2 years.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 04 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Sour Gas Project Maturity Progression Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4568</link>
      <description>Following EPIC contract awards to Samsung Engineering and Saipem totaling US$5 billion we have upgraded the project maturity from concept to construction.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 03 May 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Vietnam Gas Reserves</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4264</link>
      <description>Based on production data reported in CVX 2009 AR supplement we have estimated the condensate/gas reserve breakouts and revised the models accordingly.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 30 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>King Kong/Yosemite Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4138</link>
      <description>Shifted working interest from Mariner to Apache as a result of the announced merger of the two companies.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Geauxpher Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4540</link>
      <description>As a result of the announced merger, Mariner's working interest was shifted to Apache.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Geauxpher Operator Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4540</link>
      <description>As a result of the announced merger, Mariner's working interest was shifted to Apache.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Heidelberg Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4541</link>
      <description>As a result of the announced merger, Mariner's working interest was shifted to Apache.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Lucius Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4908</link>
      <description>As follow up to Apache acquisition of Mariner we added this discovery which is currently in the appraisal stage.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 29 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Sour Gas Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4568</link>
      <description>ConocoPhillips has decided to pull out of the Shah Sour Gas project.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 28 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Junin Block 4 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4902</link>
      <description>Junin Block 4 has been added to the database and model results.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 20 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Marulk Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3409</link>
      <description>ENI submitted its plan for development and operation (PDO) to the Norwegian government  on 4/19/2010 with a start date in the 2nd quarter of 2012.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 19 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Njord NW Flank Capital Cost</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3416</link>
      <description>In a press release dated 4/13/2010 Statoil announced the development plan including capex, production start and boe reserves.  These new data have been incorporated into the database and the cash flow model for the project.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Njord NW Flank Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3416</link>
      <description>In a press release dated 4/13/2010 Statoil announced the development plan including capex, production start and boe reserves.  These new data have been incorporated into the database and the cash flow model for the project.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Njord NW Flank Reserves</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3416</link>
      <description>In a press release dated 4/13/2010 Statoil announced the development plan including capex, production start and boe reserves.  These new data have been incorporated into the database and the cash flow model for the project.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Njord NW Flank Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3416</link>
      <description>The VNG acquisition of Endeavour Energy has been incorporated in the working interest data and a record for the tranxaction has been added to the A&amp;D portion of the database.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 13 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Laggan/Tormore Capital Cost</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3867</link>
      <description>The FMC contract (US$210 million) for subsea equipment has been added.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 12 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alvheim Capital Cost</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3373</link>
      <description>The operator announced that it will drill three additional wells over a 300 day period to commence in May 2010 using the Songa Dee.  We have updated capital spending in 2010 and 2011 to include our estimate of the drilling and completion costs from this plan.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 12 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake F Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4875</link>
      <description>We have restructured our coverage of the Christina Lake oil sands project.  Previously we reported the full field development project.  However, to improve the flexibility of our coverage with likely changes in key project parameters we have broken this asset into its 7 constituent phases.  We have also restructured the cash flow models to better capture the impact of post startup additional pads and well pairs.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake G Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4876</link>
      <description>We have restructured our coverage of the Christina Lake oil sands project.  Previously we reported the full field development project.  However, to improve the flexibility of our coverage with likely changes in key project parameters we have broken this asset into its 7 constituent phases.  We have also restructured the cash flow models to better capture the impact of post startup additional pads and well pairs.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Galapagos - Isabela and Santa Cruz Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4877</link>
      <description>This field was added using information provided by Noble in a March 2010 presentation.  The project combines Isabella, Santa Cruz and a possible additional field, Santiago.  Development of a cash flow model for the project is pending.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Reliance/Atlas Energy Marcellus Shale DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4878</link>
      <description>Following the announcement of Reliance's buy-in to Atlas Energy's Marcellus shale assets this project has been added.  A cash flow model was also added reflecting the announced drilling plans of the new JV from 2010 through 2014.  Please note that, given the acreage involved (300,000 net acres) the number of total wells drilled over the project lifetime may be considerably higher than are presently assumed in the cash flow model.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake D Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4870</link>
      <description>We have restructured our coverage of the Christina Lake oil sands project.  Previously we reported the full field development project.  However, to improve the flexibility of our coverage with likely changes in key project parameters we have broken this asset into its 7 constituent phases.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake C Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4871</link>
      <description>We have restructured our coverage of the Christina Lake oil sands project.  Previously we reported the full field development project.  However, to improve the flexibility of our coverage with likely changes in key project parameters we have broken this asset into its 7 constituent phases.  We have also restructured the cash flow models to better capture the impact of post startup additional pads and well pairs.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake A Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4872</link>
      <description>We have restructured our coverage of the Christina Lake oil sands project.  Previously we reported the full field development project.  However, to improve the flexibility of our coverage with likely changes in key project parameters we have broken this asset into its 7 constituent phases.  We have also restructured the cash flow models to better capture the impact of post startup additional pads and well pairs.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake B Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4873</link>
      <description>We have restructured our coverage of the Christina Lake oil sands project.  Previously we reported the full field development project.  However, to improve the flexibility of our coverage with likely changes in key project parameters we have broken this asset into its 7 constituent phases.  We have also restructured the cash flow models to better capture the impact of post startup additional pads and well pairs.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake E Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4874</link>
      <description>We have restructured our coverage of the Christina Lake oil sands project.  Previously we reported the full field development project.  However, to improve the flexibility of our coverage with likely changes in key project parameters we have broken this asset into its 7 constituent phases.  We have also restructured the cash flow models to better capture the impact of post startup additional pads and well pairs.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 09 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bawal Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4868</link>
      <description>This field is part of the continuing development of the Natuna Sea Block B PSC.  Information was reported by ConocoPhillips in its Investor Presentation 3/24/2010.  Development of a cash flow model has been completed but is subject to change as additional information becomes available.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Shah Sour Gas Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4568</link>
      <description>A previously reported estimate of startup by later 2013 has been pushed back to the second or third quarter of 2014.  ConocoPhillips has reported that a decision on project sanction is likely in 2010.  Development of a preliminary cash flow model for the project has been completed, subject to likely future adjustments as more data are available.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Suban Phase III General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3013</link>
      <description>Based on COP Investor Presentation 3/24/2010 we have added estimated peak output of 25 mboe/d.  This is the average of COP's estimated range from 20 to 30 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Prudhoe WRD Peak Output Downgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4192</link>
      <description>Based on the COP Investor Presentation 3/24/2010, we have downgraded the production estimates for this project slightly from 30 to 22.5 Mboe/d.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 07 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Uge Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4867</link>
      <description>The field has been added.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 06 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>South Pars Phases 17 and 18 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4864</link>
      <description>This field has been added to the database.  As of the date of first entry (4/5/2010) we are continuing to collect information prior to building a cash flow model for this project.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 05 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Integrated Gas Development Project Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4865</link>
      <description>The field was added to the database on 4/5/2010.  Cash flow models are pending.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 05 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yemen LNG Gas Supply General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4269</link>
      <description>The second liquefaction train entered production.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 05 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kupe Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3112</link>
      <description>Based on announcements made at the inauguration of the field, total capital costs were substantiallly increased.  The cash flow models were updated to reflect the higher capex.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 02 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kupe Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3112</link>
      <description>The actual start date for the field was in March 2010, nine months later than our prior estimate.  The cash flow models were updated to reflect the new information.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 02 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kupe Reserves Upgraded</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3112</link>
      <description>The startup announcement indicated total liquids reserves (including LPG) that are marginally higher than our previous data.  The models were updated to reflect the new numbers.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 02 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Bentley Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4603</link>
      <description>This field was added to the database.  Xcite Energy has indicated a potential start date for the field in late 2013.  While the field is included in the database the cash flow model is still pending as of 2 April 2010 due to insufficient data.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 02 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Fyne Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4862</link>
      <description>Fyne has been added to the database using data provided by Antrim Energy and reported in Offshore on 3/5/2010.  A cash flow model has not yet been completed as of 2 April 2010.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 02 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>BP Kirby Oil Sands Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4863</link>
      <description>This field has been added to the database as a result of the US$500 million acquisition by Devon of a 50% WI on 11 March 2010.  Because the field is still in a very early appraisal phase therie was not sufficient information on 2 April 2010 to construct cash flow models.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 02 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Algar Lake Stage 1 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4849</link>
      <description>Grizzly Oil Sands filed an application with the Alberta government for this new SAGD project.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 01 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Jofeir Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4858</link>
      <description>This was added although it is a relatively small buyback deal.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 01 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Greater Gorgon DomGas Supply Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4861</link>
      <description>We split the domestic portion out of the LNG project to better account for differences in per mcf revenues.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 01 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Greater Gorgon LNG Gas Supply General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2718</link>
      <description>added multiple constructiion contracts</description>
      <category>Prism Update</category>
      <pubDate>Thu, 01 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Lomond Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3876</link>
      <description>Scottish &amp; Southern Energy acquired the Hess share in Lomond.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 01 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Everest Ownership Change</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3771</link>
      <description>Scottish &amp; Southern Energy acquired the Hess share in Everest.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 01 Apr 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Laggan/Tormore Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3867</link>
      <description>As a result of an announced plan to proceed with development, the operator published a revised, higher cost estimate.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Laggan/Tormore General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3867</link>
      <description>As a result of recently announced plans to extend supplementary duty tax credits to the West of Shetlands we have incorporated the revised tax system in the asset model.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Perdido Regional Development Start Year Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4124</link>
      <description>Shell announced start of oil production from the Perdido project on 31 March 2010.  The prior GES estimate was that the field would enter production in June 2010.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>North Azadegan Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4855</link>
      <description>Large buyback agreement assigned to CNPC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>South Azadegan Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4856</link>
      <description>Large buyback project assigned to CNPC.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yadavaran Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4857</link>
      <description>Large buyback agreement involving Sinopec as added.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Zawtika Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4842</link>
      <description>We added this large gas export project slated to supply gas to the Thai market.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Yetagun Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4840</link>
      <description>This large legacy gas asset was added as part of a continuing program to expand coverage.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Te Giac Trang Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4388</link>
      <description>added field</description>
      <category>Prism Update</category>
      <pubDate>Wed, 31 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>SHWE Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4841</link>
      <description>This large gas export project to China involving Korean and Indian companies will supply the Chinese market.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 30 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Chagansky Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4860</link>
      <description>This is a modest size gas field that was added as a result of TNK-BP acquiring the interest.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 30 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>North Duri Steamflood - Area 13 Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4850</link>
      <description>Second phase of an enlarged steamflood project that Chevron is applying in the Duri field was added as a result of additional information in Chevron's 2010 Investor Presentation.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 30 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Nam Rong-Doi Moi Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4832</link>
      <description>Vietsovpetro announced that it was moving forward with the relatively modest size field.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 30 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>North Duri Steamflood - Area 12 Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3004</link>
      <description>small change in reported capex</description>
      <category>Prism Update</category>
      <pubDate>Tue, 30 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Peng Lai 19-3 Phase 2 Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2898</link>
      <description>In its 3/24/2010 Investor Pres COP announced that startup of phase 2 will be in "2010-2011".</description>
      <category>Prism Update</category>
      <pubDate>Wed, 24 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Malikai-Ubah-Pisagan Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3073</link>
      <description>Based on the COP Investor Presentation 3/24/2010 startup is not expected until 2012 or later.  At this time we have delayed the prior startup from mid-year 2011 (as previously reported by Petronas in April 2007) to mid year 2012.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 24 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Kebabangan Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3068</link>
      <description>Based on a COP investor presentation on 3/24/2010, startup is delayed from 2011 to 2012.  COP only indicates startup in 2012 or later.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 24 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>North East West Sak General Information</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4177</link>
      <description>COP, the operator, announced planned gross peak output of 20 to 30 Mboe/d in its Investor Presentation 3/24/2010</description>
      <category>Prism Update</category>
      <pubDate>Wed, 24 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Telemark Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4217</link>
      <description>Operator revision of prior cost estimates resulted in significant increase in cost.</description>
      <category>Prism Update</category>
      <pubDate>Sat, 20 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Telemark Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4217</link>
      <description>Operator started production in March 2010, a push back from prior expectations of a late 2009 startup.</description>
      <category>Prism Update</category>
      <pubDate>Sat, 20 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ekofisk South Reserves</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3383</link>
      <description>On 15 March 2010 ConocoPhillips, the operator, announced new estimates of reserves associated with this incremental project.  Estimates range from 157 to 220 mmboe.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Ekofisk South Capital Cost</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3383</link>
      <description>On 15 March 2010 ConocoPhillips, the operator, announced new estimates of capital costs associated with this incremental project.  Estimates range from US$4.28 billion to US$5.14 billion.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Eldfisk II Reserves</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3385</link>
      <description>ConocoPhillips, the operator, announced further details for the development plan including an estimated range of additional reserves between 220 and 280 mmboe.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Eldfisk II Capital Cost</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3385</link>
      <description>ConocoPhillips, the operator, announced further details for the development plan including an estimated range of capital spending from US$6 to US$7.1 billion.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 15 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Christina Lake D Start Year Accelerated</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4870</link>
      <description>Per Cenovus Presentation 3/11/2010 production startup has been moved up by 6 months relative to prior expectations.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 11 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Escravos GTL Capital Cost Inflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3214</link>
      <description>As reported in the Chevron 2010 10K the estimated total cost of this project has been increased from US$6 billion to US$8.4 billion.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 08 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Escravos GTL Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=3214</link>
      <description>As reported in the Chevron 2010 10K,startup of this project has been delayed by one year to 2013.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 08 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>El Merk Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2598</link>
      <description>Anadarko announced that startup of the project is likely to occur in late 2011.</description>
      <category>Prism Update</category>
      <pubDate>Tue, 02 Mar 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Hess Eagle Ford DP Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5037</link>
      <description>Following the announcement in its 2010 year end earnings release in which Hess reported that it had acquired 90,000  net Eagle Ford shale acres in 2010 we had added this drilling program.</description>
      <category>Prism Update</category>
      <pubDate>Thu, 28 Jan 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Alpine West Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4041</link>
      <description>ConocoPhillips announced that start of construction of Alpine West has been delayed from the winter 2010/2011.  The delay is at least one year.</description>
      <category>Prism Update</category>
      <pubDate>Wed, 20 Jan 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Leviathan Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=5019</link>
      <description>Following results of the exploration well, the field has been added to the database.  Pending appraisal results a model will not be generated at this time.</description>
      <category>Prism Update</category>
      <pubDate>Mon, 04 Jan 2010 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Babbage Capital Cost Deflation</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4548</link>
      <description>Based on an OGJ report, the estimated project cost was reduced from US$495 mm to US$435 mm.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 25 Sep 2009 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Rockefeller Added Field</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4925</link>
      <description>Field was added to the database and fiscal models.</description>
      <category>Prism Update</category>
      <pubDate>Sat, 15 Aug 2009 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Rockefeller Start Year</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=4925</link>
      <description>Rockefeller began production in August 2009</description>
      <category>Prism Update</category>
      <pubDate>Sat, 15 Aug 2009 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Peng Lai 19-3 Phase 2 Start Year Delayed</title>
      <link>http://prism.gordonenergysolutions.com/fieldDetail.cfm?FieldID=2898</link>
      <description>In a conference call on 4/24/2009 COP announced that Phase 2 will startup in a "couple of months".  This was a change from earlier expectations of startup in "early" 2009.</description>
      <category>Prism Update</category>
      <pubDate>Fri, 24 Apr 2009 00:00:00 GMT</pubDate>
    </item>
  </channel>
</rss>


